Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for Frontier California Inc . : Manteca CO as of March 30 , 2021 . <br /> Open violations from August 12, 2020 inspection <br /> Violation #122 - Failure to implement corrections and submit written response within 30 days of receiving <br /> the report . <br /> OBSERVATION An inspection was last done on 8/13/2019 and an inspection report was issued identifying <br /> information to be submitted to bring this site into compliance . This information was required to be submitted by <br /> 9 /12 /2019 . This information has not been received resulting in a non-compliant status for this facility. <br /> REGULATION GUIDANCE: An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions . The corrective action shall include <br /> all of the recommendations made in the report. The operator shall submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken. <br /> CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an inspection report . <br /> ® This violation was corrected ❑ This violation will be corrected by ( date ) : <br /> ® Supporting documents included <br /> Describe actions taken or will be taken to correct violation :_ _ <br /> Obtained cog of f August 13 2019 inspection report Supporting documentation attached . <br /> Violation #206 - Failure to submit a current UST Response Plan and have it available onsite . <br /> OBSERVATION An approved copy of the response plan was not available for inspection . <br /> REGULATION GUIDANCE: A copy of this plan shall be accessible on site at all times . <br /> CORRECTIVE ACTION : Immediately locate and retain a copy on site . <br /> ® This violation was corrected ® This violation will be corrected by (date ) : April 20, 2021 <br /> ® Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Copy of UST response plan provided to Desi anted Operator for filing on site . <br /> Page 1 of 2 <br />