Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> FDES1GNATE;DUN;DERGoROUND STORAGE TANK OPERATOR VISUAL INSPECTION REPORT ( Page 2 of 2) <br /> VII . INSPECTION HISTORY <br /> up action of Section III from the previous inspection been completed appropriately? Y N <br /> Attach documentation verifying appropriate service to this report. ® ❑ <br /> VIII . ALARM HISTORY <br /> Attach a copy of the alarm history report/logreport1log to this report. Y N NA <br /> Is the monitoring system powered on and in proper operating mode ? ® ❑ ❑ <br /> Has each leak detection alarm since the previous inspection been responded to appropriately? ® ❑ ❑ <br /> Attach documentation verifying appropriate service to this report. <br /> Have all containment sumps that have had a leak detection alarm since the previous inspection been responded to by a ® ❑ ❑ <br /> _qualified UST Service Technician? <br /> List below in Section IX all containment sumps that have had a leak detection alarm since the previous inspection and have not been <br /> responded to by a qualified UST Service Technician . Containment sumps listed below require a visual inspection for damage, water, debris, <br /> hazardous substance, and proper sensor location. The results of the visual inspection must be recorded in Section IX. <br /> IX. UNDERGROUND STORAGE TANK SYSTEM INSPECTION <br /> Is the containment sump free of damage , water , debris , and hazardous substance ? <br /> Containment Sump ID Y N Containment Sump ID Y N <br /> ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ <br /> Are all sensors in containment sumps inspected located to detect a leak at the earliest opportunity? ❑ ❑ <br /> Is the spill container free of damage , water , debris , and hazardous substance? <br /> Tank ID 001 /Diesel /6 ,000 Gallon ® 10 1 Tank ID ❑ ❑ <br /> Tank ID ❑ I ❑ I TanklD ❑ ❑ <br /> Is the fill pipe free of obstructions ? <br /> Tank ID 001 /Diesel/6 , 000 Gallon ® ❑ Tank ID ❑ ❑ <br /> Tank ID ❑ ❑ TanklD ❑ ❑ <br /> Is the fill cap securely on the fill pipe? <br /> Tank ID 001 /Diesel /6 , 000Gallon ® ❑ Tank ID ❑ ❑ <br /> Tank ID ❑ ❑ Tank ID ❑ ❑ <br /> Is the under-dispenser containment free of damage , water , debris , and hazardous substance? <br /> Under-Dispenser Containment ID Y I N NAI Under-Dispenser Containment ID Y N NA <br /> 01 ❑ I ❑ I ❑ ❑ ❑ <br /> 01 ❑ 1 ❑ ❑ ❑ ❑ <br /> El 1:1 E] ❑ [1 El <br /> ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ <br /> Are all sensors in under-dispenser containment located to detect a leak at the earliest opportunity? ❑ ❑ <br /> X . TESTING AND MAINTENANCE Y N NA Date Last <br /> Performed <br /> Has the monitoring system certification been completed within the past 12 months ? ® ❑ 08/02/ 18 <br /> Has the spill container testing been completed within the past 12 months ? ® ❑ 08/02/ 18 <br /> Has the overfill prevention equipment inspection been completed within the past 36 months? ® ❑ ❑ 08/02/ 18 <br /> Has the secondary containment testing been completed within the past 36 months ? I ❑ ❑ 08/24/ 17 <br /> Has the tank tightness testing been completed within required timeframes ? ❑ ❑ <br /> Has the line tightness testing been completed within the required timeframes ? ❑ EILZ <br /> Other required testing / maintenance was completed within required timeframe . (List test/maintenance items below. ) <br /> Test / Maintenance : Cathodic Test ❑ ❑ 08/23/ 17 <br /> Test / Maintenance : El ❑ <br /> Test / Maintenance : ❑ ❑ <br /> Test / Maintenance : El ❑ <br /> Test / Maintenance : El ❑ <br /> Test / Maintenance : ED] ❑ <br /> XI , FACILITY EMPLOYEE TRAINING Y N <br /> Have all individuals performing facility employee duties received the required facility employee training within the past 12 months? ® ❑ <br /> I the facility has more components than this form accommodates, additional copies of this page may be attached. <br /> Y = Yes, N = No, NA = Not Applicable , ID = Identification <br />