My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
430
>
2300 - Underground Storage Tank Program
>
PR0231425
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2021 8:26:21 AM
Creation date
4/21/2021 9:51:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231425
PE
2361
FACILITY_ID
FA0003838
FACILITY_NAME
Frontier California Inc.: Manteca CO
STREET_NUMBER
430
Direction
W
STREET_NAME
CENTER
STREET_TYPE
St
City
Manteca
Zip
95336
APN
21721070
CURRENT_STATUS
01
SITE_LOCATION
430 W Center St
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN - PAGE I (One form per facility) <br /> ROI . <br /> TYPE OF ACTION ❑ 1 . NEW PLAN ® 2 . CHANGE OF INFORMATION <br /> I. FACILITY INFORMATION <br /> FACILITY ID # (Agency Use Only) <br /> BUSINESS NAME (Same as FACILITY NAME) R02. <br /> Frontier California Inc . Manteca CO <br /> BUSINESS SITE ADDRESS R03. CITY R04. <br /> 430 W . Center Street Manteca <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility' s Hazardous Materials <br /> Business Plan . <br /> ➢ If safe to do so, facility personnel will take immediate measures to control or stop any release (e .g. , activate pump shut-off, etc. ) and, if necessary, safely remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material, but not greater than 30 calendar days, or sooner if required by the local agency. Recovered hazardous materials, unless still suitable <br /> for their intended use, will be managed as hazardous waste . <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material may be reused until it becomes too saturated <br /> to be effective. It will then be managed properly. Used absorbent material , reusable or waste, will be stored in a properly labeled and sealed container. <br /> ➢ Facility personnel will determine whether or not any water removed from secondary containment systems, or from clean-up activity , has been in contact with any <br /> hazardous material . If the water is contaminated, it will be managed as hazardous waste. If the water has a petroleum sheen (i . e. , rainbow colors), it is <br /> contaminated. A thick floating petroleum layer may not necessarily display rainbow colors. Water (hazardous or non-hazardous) from sumps, spill containers, eta <br /> will not be disposed to storm water systems . <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 205 . Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 206 . Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 207 . Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product/waste, and the added material or resulting material from such a combination is not compatible with secondary containment . <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE : Spill control and clean-up equipment kept permanently on-site is listed in the facility ' s Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly, and after each use, and supplies are replenished as needed. Defective equipment is repaired or replaced as necessary . <br /> EQUIPMENT NOT PERMANENTLY ON-SITE, BUT AVAILABLE FOR USE IF NEEDED: (Complete only if applicable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> RIO. R20. R30. <br /> RI L R21 . R31 . <br /> RI2. R22. R32, <br /> R13. - R23 . R33. <br /> R14. R24. R34. <br /> R15 . R25. R35. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S) IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME R40. TITLE R50. <br /> Masood Choudhur Environmental Manager NAME R41 . TITLE R5 1 . <br /> Timothy Prade CSLT-ENVR, HLTH & SAFETY <br /> NAME R42. TITLE R52. <br /> NAME R43. TITLE R53. <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE, STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS : <br /> ❑ Additional system testing or data collection ® Inspection by qualified persons ❑ Recalibration of equipment <br /> ❑ Other: <br />
The URL can be used to link to this page
Your browser does not support the video tag.