Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> DESIGNATED UNDERGROUND STORAGE TANK OPERATOR VISUAL INSPECTION REPORT ( Page 2 of 2) <br /> VII , INSPECTION HISTORY <br /> Has each follow- up action of Section III from the previous inspection been completed appropriately? Y N <br /> Attach documentation verifying appropriate service to this report. ® ❑ <br /> VIII . ALARM HISTORY <br /> Attach a cony of the alarm history report/logreportliog to this report, Y N NA <br /> Is the monitoring system powered on and in proper operating mode? X ❑ ❑ <br /> Has each leak detection alarm since the previous inspection been responded to appropriately? ® ❑ ❑ <br /> Attach documentation verifving appropriate service to this report. <br /> Have all containment sumps that have had a leak detection alarm since the previous inspection been responded to by a X ❑ ❑ <br /> ualified UST Service Technician ? <br /> List below in Section IX all containment sumps that have had a leak detection alarm since the previous inspection and have not been <br /> responded to by a qualified UST Service Technician . Containment sumps listed below require a visual inspection for damage, water, debris, <br /> hazardous substance, and proper sensor location . The results of the visual inspection must be recorded in Section IX. <br /> IX , UNDERGROUND STORAGE TANK SYSTEM INSPECTION <br /> Is the containment sump free of damage , water , debris , and hazardous substance? <br /> Containment Sump ID Y N Containment Sump ID Y N <br /> ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ <br /> Are all sensors in containment sumps inspected located to detect a leak at the earliest opportunity? ❑ ❑ <br /> Is the spill container free of damage , water , debris , and hazardous substance? <br /> Tank ID 001 /Diesel /6 , 000 Gallons X ❑ Tank ID 01 ❑ <br /> Tank ID I ❑ ❑ Tank ID ❑ ❑ <br /> Is the fill pipe free of obstructions ? <br /> Tank ID 001 /Diesel/6 , 000 Gallons ® ❑ Tank ID ❑ ❑ <br /> Tank ID I <br /> ElI ElI Tank ID El <br /> Is the fill cap securely on the fill pipe? <br /> Tank ID 001 /Diesel/6 , 000 Gallons 10 1 ❑ Tank ID ❑ ❑ <br /> Tank ID El El Tank ID El ❑ <br /> Is the under-dispenser containment free of damage , water , debris , and hazardous substance? <br /> Under-Dispenser Containment ID Y I N I NAI Under-Dispenser Containment ID Y N NA <br /> ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ <br /> EEI <br /> El El El El ElEl El El El El❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ <br /> Are all sensors in under-dispenser containment located to detect a leak at the earliest opportunity? ❑ ❑ X <br /> X. TESTING AND MAINTENANCE Y N NA Date Last <br /> Performed <br /> Has the monitoring system certification been completed within the past 12 months ? X ❑ 08/02/ 18 <br /> Has the spill container testing been completed within the past 12 months ? X ❑ 08/02/ 18 <br /> Has the overfill prevention equipment inspection been completed within the past 36 months? X ❑ ❑ 08/02/ 18 <br /> Has the secondary containment testing been completed within the past 36 months ? X ❑ ❑ 08/24/ 17 <br /> Has the tank tightness testing been completed within required timeframes ? ❑ ❑ X <br /> Has the line tightness testing been completed within the required timeframes ? ❑ ❑ X <br /> Other required testing / maintenance was completed within required timeframe . (List test/maintenance items below. ) <br /> Test / Maintenance : Cathodic Protection X El 08/23 / 17 <br /> Test / Maintenance : ❑ ❑ <br /> Test / Maintenance : ❑ ❑ <br /> Test / Maintenance : ❑ ❑ <br /> Test / Maintenance : ❑ ❑ <br /> Test / Maintenance : ❑ ❑ <br /> XI . FACILITY EMPLOYEE TRAINING Y N <br /> Have all individuals performing facility employee duties received the required facility employee training within the past 12 months ? X ❑ <br /> ! the facility has more components than this form accommodates, additional copies of this page may be attached. <br /> Y = Yes, N = No, NA = Not Applicable, ID = Identification <br />