Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> DESIGNATED UNDERGROUND STORAGE TANK OPERATOR VISUAL INSPECTION REPORT (Page 2 of 2) <br /> VII . INSPECTION HISTORY <br /> Has each follow- up action of Section III from the previous inspection been completed appropriately? Y N <br /> Attach documentation verifying appropriate service to this report. ® ❑ <br /> VIII . ALARM HISTORY <br /> Attach a cony of the alarm history report/logreportliog to this re ort. Y N INA <br /> Is the monitoring system powered on and in proper operating mode? N ❑ ❑ <br /> Has each leak detection alarm since the previous inspection been responded to appropriately? ® ❑ ❑ <br /> Attach documentation verifving a prooriate service to this report. <br /> Have all containment sumps that have had a leak detection alarm since the previous inspection been responded to by a ® El F1ualified UST Service Technician ? <br /> List below in Section IX all containment sumps that have had a leak detection alarm since the previous inspection and have not been <br /> responded to by a qualified FIST Service Technician . Containment sumps listed below require a visual inspection for damage, water, debris, <br /> hazardous substance, and proper sensor location . The results of the visual inspection must be recorded in Section IX. <br /> IX , UNDERGROUND STORAGE TANK SYSTEM INSPECTION <br /> Is the containment sump free of damage , water , debris , and hazardous substance? <br /> Containment Sump ID Y N Containment Sump ID Y N <br /> ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ <br /> Are all sensors in containment sumps inspected located to detect a leak at the earliest opportunity? ❑ ❑ <br /> Is the spill container free of damage , water , debris , and hazardous substance? <br /> Tank ID 00 1 /Diesel /6 ,000gal N ❑ Tank ID ❑ FO <br /> Tank ID El El Tank ID ❑ <br /> Is the fill pipe free of obstructions ? <br /> Tank ID 001 / Diesel/6 , 000gal ® ❑ Tank ID ❑ ❑ <br /> Tank ID 101 ❑ I Tank ID I ❑ ❑ <br /> Is the fill cap securely on the fill pipe? <br /> Tank ID 001 /Diesel/6 , 000gal ® ❑ Tank ID ❑ ❑ <br /> Tank ID El ❑ Tank ID ❑ ❑ <br /> Is the under-dispenser containment free of damage , water , debris , and hazardous substance? <br /> Under-Dispenser Containment ID Y I N I NAI Under-Dispenser Containment ID Y I N NA <br /> 01 ❑ 1 ❑ 1 ❑ ❑ ❑ <br /> ❑ 1:11 ❑ I ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ 01 ❑ <br /> Are all sensors in under-dispenser containment located to detect a leak at the earliest opportunity? ❑ ❑ Xl <br /> X . TESTING AND MAINTENANCE Y N NA Date Last <br /> Performed <br /> Has the monitoring system certification been completed within the past 12 months ? N ❑ 08/ 13/ 19 <br /> Has the spill container testing been completed within the past 12 months ? N ❑ 08/ 13/ 19 <br /> Has the overfill prevention equipment inspection been completed within the past 36 months ? N ❑ ❑ 09/ 13 / 18 <br /> Has the secondary containment testing been completed within the past 36 months ? N ❑ ❑ 08/24/ 17 <br /> Has the tank tightness testing been completed within required timeframes ? ❑ ❑ <br /> Has the line tightness testing been completed within the required timeframes ? ❑ ❑ N <br /> Other required testing / maintenance was completed within required timeframe . (List tesbmaintenance items below. ) <br /> Test / Maintenance : Cathodic Protection N ❑ 08/23 / 17 <br /> Test / Maintenance : ❑ ❑ <br /> Test / Maintenance : ❑ ❑ <br /> Test / Maintenance : ❑ ❑ <br /> Test / Maintenance : ❑ ❑ <br /> Test / Maintenance : ❑ ❑ <br /> XI . FACILITY EMPLOYEE TRAINING )ITN <br /> Have all individuals performing facility employee duties received the required facility employee training within the past 12 months ? <br /> I the facility has more components than this form accommodates, additional copies of this page may be attached. <br /> Y = Yes , N = No, NA = Not Applicable , ID = Uentification <br />