My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ARGONAUT
>
1819
>
2900 - Site Mitigation Program
>
PR0508343
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2021 2:59:02 PM
Creation date
4/21/2021 1:39:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0508343
PE
2960
FACILITY_ID
FA0008041
FACILITY_NAME
JOHN TAYLOR - STOCKTON
STREET_NUMBER
1819
Direction
S
STREET_NAME
ARGONAUT
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16320008
CURRENT_STATUS
01
SITE_LOCATION
1819 S ARGONAUT ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Michael Kith [EH] <br /> From: Orin Regier <ORegier@Geosyntec.com> <br /> Sent: Wednesday, September 06, 2017 11:14 AM <br /> To: Michael Kith [EH] <br /> Cc: Srinivasa Varadhan; Peter Dennehy <br /> Subject: Geosyntec Consultants -Well Permit Update <br /> Attachments: Rev 8-24 Well Schematic and completion details - DTD - Geosyntec - Stockton CA.pdf <br /> Dear Mr. Kith, <br /> Please see below for details regarding the information you requested. <br /> 1. The approximate location of the plug that separates the 2 wells. <br /> Ans:The plug will be approximately at the middle of the screened section (approximately 255 feet from <br /> either end of the screen) to prevent preferential flow across the screen interval. <br /> 1. Plug specification. <br /> Ans: The Work Plan that we provided does indicate installation of a horizontal well as part of Phase 2 <br /> implementation. The description of the horizontal well in the work plan did not include a plug since it was in <br /> the conceptual stages of development. However,for practical purposes and to prevent preferential flow of <br /> our injection solution into the well,the design has been modified to include a plug in the middle of the <br /> screen length.The total screen length is approximately 510 feet with the plug located midway <br /> (approximately at 255 feet from the beginning of the screen).The plug will consist of a 4-inch HDPE blank <br /> insert that will be installed on Site while pulling in the well into the borehole. (Please see attached schematic <br /> depicting the location of the plug for clarity). <br /> 1. What is"open hole (natural sand pack)? <br /> Ans: As we had described before, a horizontal well does not have a filter pack as opposed to one for a <br /> vertical well because of challenges associated with installing a filter pack horizontally.Therefore,the sand <br /> pack surrounding the well screen, consisting of the surrounding geologic formation will serve as the filter <br /> pack for the well. Once the well is installed,formation material will simply slough over the well screen <br /> sections. <br /> 1. Is there any bentonite transitional seal? <br /> Ans:There will be no bentonite transitional seal. A soft rubber shale trap packer system will be used to <br /> prevent grout placement within the screen interval. The grout mix ratio depicted in the well schematic <br /> diagram can be adjusted in the field to satisfy SJCEHD requirements. <br /> Please let us know if this answers your questions. <br /> Thank you, <br /> Orin Regier <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.