My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:42:13 PM
Creation date
4/21/2021 2:55:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2012
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4434_PR0440003_31130 CORRAL HOLLOW_2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> Natalia Subbotnikova [EH] <br /> From: Joyesh Chandra [Jchandra@sjgov.org] <br /> Sent: Thursday, March 08, 2012 3:13 PM <br /> To: Natalia Subbotnikova[EH] <br /> Cc: Michael Carroll;jmhower@geo-logic.com <br /> Subject: RE: Corral Hollow_EMP Phase 2—Well Construction Schedule <br /> Hello Natalia <br /> This is email serves as a confirmation regarding Corral Hollow's EMP project schedule from <br /> March 12th to 16th. The driller will be ready to install the first permanent well at approximately <br /> 10:30 am on March 12th. We request EHD's inspection at this time. Other consecutive <br /> inspections of the well construction will be coordinated with you in the field. The driller has <br /> been notified about EHD's inspection time from 9:00am to 3:30 pm. <br /> A geologist form Geo-Logic Associates will be on-site to document well construction. If you <br /> have any questions, please give me a call. <br /> Thanks <br /> JOYESH CHANDRA <br /> SAN JOAQUIN COUNTY <br /> PUBLIC WORKS DEPARTMENT <br /> SOLID WASTE DIVISION <br /> PH: (209) 468-3066 <br /> Fax: (209) 468-3078 <br /> From: Joyesh Chandra <br /> Sent: Monday, January 30, 2012 9:08 AM <br /> To: 'Natalia Subbotnikova [EH]' <br /> Cc: Michael Carroll <br /> Subject: Corral Hollow_EMP Phase 2—Schedule <br /> Hello Natalia <br /> We have tentatively scheduled the phase 2 investigation work of the Evaluation Monitoring <br /> Program (EMP) work near our Corral Hollow Landfill in reference to the EMP work plan <br /> Revision No 2. This work schedule is depended on the encroachment permit approval from <br /> Caltrans and weather conditions. <br /> We request EHD to make a note of the project's tentative schedule. As required by the drilling <br /> permit general guidelines, we will confirm the work schedule five working days before starting <br /> the project. The driller has been notified about EHD's inspection time from 9:00am to 3:30 <br /> pm. <br /> TENTATIVE PROJECT SCHEDULE <br /> 3/8/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.