Laserfiche WebLink
Page 1 of 2 <br /> Natalia Subbotnikova [EH] <br /> From: Joyesh Chandra [Jchandra@sjgov.org] <br /> Sent: Thursday, March 08, 2012 3:13 PM <br /> To: Natalia Subbotnikova[EH] <br /> Cc: Michael Carroll;jmhower@geo-logic.com <br /> Subject: RE: Corral Hollow_EMP Phase 2—Well Construction Schedule <br /> Hello Natalia <br /> This is email serves as a confirmation regarding Corral Hollow's EMP project schedule from <br /> March 12th to 16th. The driller will be ready to install the first permanent well at approximately <br /> 10:30 am on March 12th. We request EHD's inspection at this time. Other consecutive <br /> inspections of the well construction will be coordinated with you in the field. The driller has <br /> been notified about EHD's inspection time from 9:00am to 3:30 pm. <br /> A geologist form Geo-Logic Associates will be on-site to document well construction. If you <br /> have any questions, please give me a call. <br /> Thanks <br /> JOYESH CHANDRA <br /> SAN JOAQUIN COUNTY <br /> PUBLIC WORKS DEPARTMENT <br /> SOLID WASTE DIVISION <br /> PH: (209) 468-3066 <br /> Fax: (209) 468-3078 <br /> From: Joyesh Chandra <br /> Sent: Monday, January 30, 2012 9:08 AM <br /> To: 'Natalia Subbotnikova [EH]' <br /> Cc: Michael Carroll <br /> Subject: Corral Hollow_EMP Phase 2—Schedule <br /> Hello Natalia <br /> We have tentatively scheduled the phase 2 investigation work of the Evaluation Monitoring <br /> Program (EMP) work near our Corral Hollow Landfill in reference to the EMP work plan <br /> Revision No 2. This work schedule is depended on the encroachment permit approval from <br /> Caltrans and weather conditions. <br /> We request EHD to make a note of the project's tentative schedule. As required by the drilling <br /> permit general guidelines, we will confirm the work schedule five working days before starting <br /> the project. The driller has been notified about EHD's inspection time from 9:00am to 3:30 <br /> pm. <br /> TENTATIVE PROJECT SCHEDULE <br /> 3/8/2012 <br />