Laserfiche WebLink
Page 4 of 4 <br /> the EA that the plan has been implemented.The plan shall describe the nature and extent of the problem and the <br /> proposed remedy. <br /> (4)Construct a gas control system that meets the criteria of Section 20939,designed by a registered civil or mechanical <br /> engineer,within a period of time specified by the EA. Installation of the system shall be in accordance with a design and <br /> in a manner approved for construction by the EA in coordination, if applicable,with the RWQCB. <br /> (b)The EA,with concurrence by the CIWMB, may establish an alternative schedule for demonstrating compliance with <br /> subdivisions(a)(2)and(3)pursuant to 40 CFR 258.23(c)(4). <br /> (c)The EA shall forward notifications and approvals made pursuant to%(a)(1), (2)and(3)to the CIWMB. <br /> Thank you. <br /> Natalia Subbotnikova,Senior REHS <br /> San Joaquin County Environmental Health Department <br /> 1868 E Hazelton Ave <br /> Stockton,CA 95205 <br /> (209)468-0338 <br /> 7/16/2012 <br />