Laserfiche WebLink
Page 1 of 1 <br /> Natalia Subbotnikova [EH] <br /> From: Robert McClellon [EH] <br /> Sent: Friday, October 26, 2012 8:26 AM <br /> To: 'Michael Carroll' <br /> Cc: Natalia Subbotnikova [EH]; Joyesh Chandra <br /> Subject: RE: Review time for new soil gas wells at Corral Hollow <br /> Mike, I would like to stress that if the package is complete (complete application, site plan and site safety <br /> plan), then the time frame for approval could be shortened up. I can not speak for Calrecycle and their <br /> time frames. Robert <br /> Robert McClellon, Program Coordinator REHS <br /> Environmental Health Department <br /> 1868 E. Hazelton Ave <br /> Stockton, CA 95205-6232 <br /> Phone (209) 468-0332 <br /> Fax (209) 468-8392 <br /> From: Michael Carroll [mailto:mcarroll@sjgov.org] <br /> Sent: Thursday, October 25, 2012 2:10 PM <br /> To: Robert McClellon [EH] <br /> Cc: Natalia Subbotnikova [EH]; ]oyesh Chandra <br /> Subject: Review time for new soil gas wells at Corral Hollow <br /> Hi Robert, <br /> We are in the process of submitting a schedule for additional soil gas wells(2)at Corral Hollow <br /> Landfill, and need to include review time at END for the design prior to installation. loyesh spoke <br /> with Natalia on this, and I understand that a review time of 30 days is normal. <br /> I may be questioned as to the length of the review time,so I was wondering,considering that the <br /> design will be the same as the previous 3-probe wells, could the review time could be shortened? <br /> Thanks <br /> Mike <br /> W.Michael Carroll,PE <br /> Phone(Direct):209-468-8504 <br /> 10/26/2012 <br />