• <br />0 <br />obtaining encroachment permits from Caltrans and drilling permits from San Joaquin <br />County Environmental Health Department (EHD). <br />County (Solid Waste Division) staff has submitted encroachment permits for the <br />installation of new step -out wells to the California Department of Transportation on <br />January 12, 2012, for access to the location for the second set of wells (Figure 7). The <br />County expects to receive this permit without complication. <br />Solid Waste Division staff also submitted request for drilling permits to the Count EHD <br />q gp Y <br />on January 18, 2012. County staff and expect to be issued these permits as well. <br />Drilling of these three wells is tentatively scheduled for February 24, 2012, assuming <br />encroachment permit and drilling permits have been issued and surface conditions are <br />acceptable. It is anticipated that the three Phase II step -out wells will be drilled and <br />sampled in five working days. Analytical results will be available within 15 working days <br />after sampling is completed, and a determination to complete well construction or <br />abandon the step -out wells will be made after the data are received and reviewed. <br />Permanent wells will be constructed in the Phase II borings if the extent of groundwater <br />contamination can be assessed from data from these borings. Final construction of <br />wells in the Phase II borings will include removing any temporary well materials, <br />reaming the borehole and advancing the borehole to the target depth, installing well <br />casing, sand pack, sanitary seal, sounding port, monument, and bollards in accordance <br />with project specifications, and developing the wells. <br />It is contemplated that well construction will commence as soon as possible after the <br />temporary step -out well data are received and reviewed. Well construction will require <br />approximately seven working days. <br />Assuming the Phase II borings allow assessment of the extent of release, the County will <br />submit a Phase II well construction report to the RWQCB within 30 days after well <br />construction is completed. A Phase II EMP report, including an Engineering Feasibility <br />Study, will be submitted to the RWQCB within 90 days after well construction is <br />completed. <br />If the Phase II borings do not allow assessment of the extent of release, then additional <br />(Phase III) boring locations will be sought. <br />I <br />EMP Report—Phase IGeo-Loic Page ■ 10 <br />Corral Hollow Sanitary Landfill ASS O C 1 ATE 5g <br />February 1, 2012 <br />