Laserfiche WebLink
CALTRANS RIGHT-OF-WAY <br />(APPROX) <br />HIGH PRESSURE <br />PETROLEUM PIPELINE <br />(APPROXIMATE LOCATION) <br />mom <br />VA EXPLANATION: <br />PROPOSED GROUNDWATER MONITORING WELL <br />DEEP AQUIFER GROUNDWATER MONITORING WELL <br />SWiLLOW AQUIFER GROUNDWATER MONITORING WELL <br />TEMPORARY SHRIOW AQUIFER GROUNDWATER (GW) <br />MONITORING POINT (OCTOBER -NOVEMBER 2011) <br />GAS MONITORING WELL <br />® SURFACE WATER SAMPLING POINT <br />17) ® STORM WATER (NPDES) SAMPLING PONT <br />(230.52) OMM 2011 GW ELEVATION (FEET ABOVE <br />i - CALTRANS CLOSURE AREA _6/ CONTOUR LINE SHOWING OCTOBER 2011 <br />(APPROX 0.2 AC.) ® GROUNDWATER POTENTIOMETRIC SURFACE <br />ELEVATIONS (CONTOUR INTERVAL = 5 FEET) <br />0.04 <br />NEW LFG WELLS ATTACHED DICTION AND GRADIENT (ft/ft) OF GW FLOW <br />TO EXISTING LFG SYSTEM <br />