My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:42:28 PM
Creation date
4/21/2021 3:36:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2013
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />D Arrange the three probe pipes in the bore hole such that the pipes are in the <br />correct order and can be easily attached to the steel channel when the <br />enclosure is installed, <br />E Probe Pipe Cock Valve Installation. <br />1 Probe pipe cock valve shall be installed after the well enclosure. <br />2 Cut probe pipes to install probe pipe cock valves. When installed, probe <br />pipe cock valves shall have clearance from the top of the well enclosure lid <br />as specified in the well enclosure details. <br />3 Install Polyethylene tubing inside the probe pipe. <br />4 Install PVC fittings on probe pipe as shown on the soil gas well figures. <br />Apply Teflon tape on all threaded fittings. All fittings shall be secure and <br />tight. <br />5 Connect Polyethylene tubing to the cock valve and then install cock valve <br />on probe pipe. <br />6 Paint probe pipe cock valves per the depth of the probe pipe prior to <br />installation as shown on the soil gas well figures. <br />3.06 WELL ENCLOSURE INSTALLATION <br />A Brace enclosure plumb during concrete placement, until set. <br />B Inscribe the concrete base with the designation of the well as shown on the <br />plans. Inscription shall be neat and professional in appearance. <br />C Once the concrete base of the enclosure has hardened, pour neat cement <br />inside the protective enclosure to the finish grade level of the concrete base <br />in the presence of the Engineer. When pouring cement slurry inside the <br />enclosure, protect probes from contact with neat cement. <br />D Clamp probe pipe to the steel channel at the identified clamping location. <br />E Apply the final coat of paint in the field. <br />F Well enclosure shall be labeled with the designated well number as shown <br />on the contract figures using yellow paint. Labeling shall be by oil-based <br />paint with brush, in a neat and professional manner with lettering a <br />minimum of four (4) inches in height using stencils. <br />G Well enclosures not installed to the satisfaction of the Engineer will be re- <br />installed at no additional cost to the County. <br />-Public Works <br />9 San Joaquin Count <br />Corral Hollow Landfill q County <br />-Public <br />Gas Monitoring Well Specs Solid Waste Division <br />
The URL can be used to link to this page
Your browser does not support the video tag.