Laserfiche WebLink
v <br />Page 1 of 1 <br />From: Joyesh Chandra [Jchandra@sjgov.org] <br />Sent: Tuesday, June 25, 2013 4:30 PM <br />To: Robert McClellon [EH] <br />Cc: Natalia Subbotnikova [EH]; Michael Carroll; Randy Dockery (rdockery@greggdrilling.com); Anderson, <br />Garrick (Garrick.Anderson@cbi.com); Isham, Julian (Julian.lsham@cbi.com) <br />Subject: EHD Inspection Appointments -Soil Gas Wells @ Corral Hollow <br />Hello Robert, <br />Gregg drilling will install two Soil Gas Wells at Corral Hollow Landfill (SR # 0066942) from <br />August 19th through August 23rd, 2013. <br />EHD inspections will be needed starting on August 19th at 11:00 am. Other consecutive EHD <br />inspections will be scheduled with EHD after the first inspection in the field according to the <br />progress of the well installation within EHD's inspection time frame. <br />If there are any changes in this schedule, EHD will be notified 5 working days before the start <br />date. <br />Thanks <br />JOYESH CHANDRA <br />SAN JOAQUIN COUNTY <br />PUBLIC WORKS DEPARTMENT <br />SOLID WASTE DIVISION <br />1810 E. HAZELTON AVE <br />STOCKTON, CA 95201 <br />PH: (209) 468-3066 <br />FAX: (209) 468-3078 <br />Email:ichandra@siaov.oro <br />6/26/2013 <br />