My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:42:28 PM
Creation date
4/21/2021 3:36:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2013
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subbotnikova [EF <br />From: Ande4115n, Garrick <Garrick.Anderson@CBIFederai9LI'fvices.com> <br />Sent: Tuesday, August 20, 2013 11:09 PM <br />To: Michael Carroll; Joyesh Chandra; Isham, Julian <br />Cc: Anderson, Garrick; TGarver@greggdrilling.com; Natalia Subbotnikova [EH] <br />Subject: Status of Well GW -9 <br />Gentlemen, <br />As of the end of today, August 20th, well GW -9 had been drilled (to 50.5 ft), the <br />three individual 3/4 -inch, Schedule 80, PVC screens and blank PVC riser pipe have <br />been installed. <br />GW -9 backfill was completed as follows: <br />The lower screen was run from 43 to 49.5 ft. Gravel -pack was placed from 42.5 to 50 ft. <br />Hydrated bentonite seal was placed from 37.5 ft to 42.5 ft. Note: the bentonite seal was <br />adjusted downwards slightly (as agreed) , to extend into the top of the underlying clay interval. <br />Immediately below this formation clay is the lower screen that crosses a silt zone of moderately - <br />heavy iron oxidation staining. <br />The intermediate screen was run from 15.5 to 37.0 ft. Gravel -pack was placed from 15 to 37.5 ft. <br />Hydrated bentonite seal was placed from 10 to 15 ft. <br />The upper screen was run from 5.5 to 9.5 ft. Gravel -pack was placed from 5.0 to 10 ft. <br />Hydrated bentonite seal was placed from 5 ft all the way to surface. <br />* Note: Surface soil of a 5' x 5' x 1.5' area was dug out for the upcoming surface -completion <br />concrete work. The soil was dug out around the existing hydrated bentonite column of 8" diameter <br />(the continuation of the underlying backfill) which contains the three PVC riser -pipes that extend <br />above ground surface. <br />The plan for Aug. 21st is as follows: <br />0600 hrs - Garrick onsite <br />0700 hrs - Gregg Drilling crew onsite <br />0730 hrs - Gregg's air -knife crew to arrive onsite <br />0700 to 0730 hrs - Shell Pipeline Clearance crew to arrive <br />rs - San Joaquin County Inspector, Natalia Subbortnikova, to arrive <br />1130 to 1200 hrs - Joyesh to arrive onsite <br />First thing tomorrow morning, the air -knife crew is to air -knife two locations; the first will be on top <br />of Shell's pipeline to locate the pipeline's actual position; the second location to be air -knifed will be <br />at the GW -8 location. Once the air -knifing is completed, Gregg Drilling will be ready to immediately <br />begin well -drilling. <br />Please call if there are any questions or concerns. <br />Thank you! <br />Garrick <br />Garrick Anderson, CPG <br />Project Geologist, CB&I <br />Garrick.Anderson(a)cbifederalservices.com <br />Cell: 510-206-1373 <br />
The URL can be used to link to this page
Your browser does not support the video tag.