My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
31130
>
4400 - Solid Waste Program
>
PR0440003
>
CORRESPONDENCE_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 2:42:28 PM
Creation date
4/21/2021 3:36:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2013
RECORD_ID
PR0440003
PE
4434
FACILITY_ID
FA0003698
FACILITY_NAME
CORRAL HOLLOW LANDFILL
STREET_NUMBER
31130
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25303010
CURRENT_STATUS
01
SITE_LOCATION
31130 CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Natalia Subbotnikova i <br />From: Mic„ el Carroll <mcarroll@sjgov.org> 'w <br />Sent: Tuesday, October 01, 2013 11:56 AM <br />To: Robert McClellon [EH] <br />Cc: Joyesh Chandra; Natalia Subbotnikova [EH]; Jayna Rutz <br />Subject: Soil removal at Corral Hollow <br />Robert, <br />This confirms the phone message left earlier, that PSC is removing ash -containing soil from the stockpile at Corral <br />Hollow for disposal at Kettleman Hills. Loading operations are complete by noon, so if you wanted to observe, you <br />should do so in the morning. I stressed the importance of dust control to the operators. <br />I expect PSC will complete their portion of the stockpile (480 tons) by Friday Oct 4. <br />The remaining portion of the pile (estimated at 420 tons) will be removed under a change order with RJ Gordon, the <br />closure project contractor. I anticipate that RJ Gordon will start work no later than the 14th, assuming approval of <br />the contract change order now with Public Works Admin staff. I will let you know when the schedule for that work is <br />more firm. <br />Please call with any questions. <br />Best regards, <br />Mike Carroll <br />W. Michael Carroll, PE <br />Senior Civil Engineer, Public Works/Solid Waste <br />Phone (Direct): 209-468-8504 <br />
The URL can be used to link to this page
Your browser does not support the video tag.