FIXTURE SCHEDULE
<br />PLUMBING
<br />LEGEND
<br />PLUMBING
<br />ACCESSORIES
<br />SYMBOL
<br />DESCRIPTION
<br />TRIM
<br />OWES FURNISHED BY OTHERS AND
<br />WITH SOAP DISPENSER, PLUMBING
<br />SYMBOL
<br />DESCRIPTION
<br />BALL VALVE <= 4", GATE VALVE>4"
<br />3 10'x14'x5' SINK BOWL SPLASPAPERHES,
<br />W/DAERATORHAND SPLASH ILT IN CONTRACTOR
<br />_—_CW
<br />COLD WATER LINE
<br />—�—
<br />BALANCING VALVE
<br />MOUNTEDE4'�CWGOOSENECK/FAUCET
<br />HW
<br />HOT WATER LINE
<br />��
<br />OVERFLOW.
<br />DRAWINGS FOR EXACT SIZE
<br />POT SINK COMPLETE WITH ADVANCE TABC❑ 15' REFER TO FOR
<br />BOARDS,
<br />----
<br />® TD
<br />TRENCH DRAIN
<br />--��j�—
<br />GAS COCK
<br />3 COMPARTMENT
<br />SWING SPOUT, 10x14 SINK BASINS, 2-24 DRAIN
<br />ADVANCE TABC❑ 15-77.' REFER T❑ KITCH
<br />AC
<br />ABOVE CEILING
<br />i COMPARTMENT POT SINK COMPLETE WITH DRAWINGS FOR EXACT SIZE
<br />DRAIN BOARD.
<br />SS
<br />SANITARY SEWER
<br />BELOW FINISHED FLOOR
<br />SWING SPOUT, 18x18 SINK BASINS, 24'
<br />OP SINK, CORNER UNIW/INTEGRAL
<br />GL
<br />GREASE LINE
<br />BFF
<br />ABOVE FINISHED FLOOR
<br />ENAMELED CAST IRON M—RC—WHK—SH FAUCET,
<br />PIPE, ZURN Z -841M1
<br />—HV
<br />HORIZONTAL VENT
<br />AFF
<br />STRAINER AND DRAIN,
<br />SINK FURNISHED BY OWNER,
<br />WALL HUNG HATING
<br />_
<br />STORM DRAIN LINE
<br />BFG
<br />BELOW FINISHED GRADE
<br />OWNER FURNISHED STAINLESS STEEL
<br />0.5 GPM NON AERATING FAUCET, INSTALLED BY CONTRACTOR
<br />FA
<br />MV
<br />MIXING VALVE
<br />W/SOAP AND TOWER DISPENSER,
<br />CONTRACTOR TO FURNISH AND INSTALL
<br />C�
<br />CONDENSATE DRAIN
<br />WATER CLOSET
<br />GRID DRAIN W/DRAIN PIPE.
<br />KTSR17FC STOPS & B -16A SUPPLY HOSES, 1-1/2'
<br />SINK PROTECTIVE PIPE
<br />_ MA _
<br />MEDICAL/DENTAL AIR
<br />WC
<br />BRASSCRAFT
<br />P—TRAP AND TRUEBRO LAV—GUARD-2 UNDER
<br />BACKING SUPPORT FOR HANGER,
<br />—V _
<br />VACUUM
<br />UR
<br />URINAL
<br />KIT, WALL
<br />CIRCUIT SETTER IN
<br />V, VR, VTR
<br />VENT, VENT RISER, VENT THRU ROOF
<br />L
<br />LAVATORY
<br />TRIM AND BRONZE IMPELLAR, SNAP ON AQUA STAT, SNAP INSTALL
<br />LINE, SET AT 110°F
<br />HD.
<br />_SSD _
<br />SANITARY SEWER DROP
<br />S
<br />SINK
<br />BRONZE
<br />ON TIMECLOCK, 110V, 1/12 HP, 2 GPM@12'
<br />MS
<br />SERVICE/MOP SINK
<br />GREASE TRAP WITH METAL COVER, HDPE DENIER 1— FLOW LIMITING
<br />DEVICE, 1-1/4' ORIFICE C25
<br />RWL
<br />RAIN WATER LEADER
<br />DF
<br />DRINKING FOUNTAIN
<br />SCHIER 249# INFLOOR
<br />BASIN, INTERNAL BAFFLES, 4' INLET AND OUT ET, PEAK FLOW S
<br />SET UNIT IN 6' SAND BASE GPM)
<br />RD
<br />ROOF DRAIN
<br />FHS
<br />FIRE HOSE STANDPIPE
<br />GPM W/50# (SGAL) GREASE CAPACITY.
<br />MOVEMENT,
<br />AD
<br />AREA DRAIN
<br />T❑ LEVEL AND PREVENT
<br />CATCH BASIN (DROP INLET)
<br />INV
<br />INVERT ELEVATION
<br />CB, DI
<br />FG
<br />FINISH GRADE
<br />�— CO
<br />CLEAN OUT
<br />CUT OFF POINT — COP
<br />THE FOLLOWING CODES,
<br />I�— wCO
<br />WALL CLEAN OUT
<br />0
<br />POINT OF CONNECTION — POC
<br />2M TO
<br />FCO
<br />FLOOR CLEAN OUT
<br />ACCESS DOOR — SEE SCHEDULE
<br />YCO
<br />YARD CLEAN OUT
<br />AD
<br />CI
<br />CAST IRON
<br />�— FD
<br />FLOOR DRAIN
<br />MATERIAL, FIRE
<br />UC :TIONS
<br />E]— FS
<br />FLOOR SINK
<br />CENTER LINE
<br />INSPECTINGIAUTHOR AUTHORITYFOR THEIR REVIEWSEALING
<br />TNINT
<br />INSTALLATION
<br />HDR
<br />HEADER
<br />IN WATERPROOF POUCHES
<br />AND COMMENT BY THE ENGINEER AND ARCHITECT OF
<br />TP
<br />TRAP PRIMER VALVE
<br />DN
<br />DOWN
<br />AND
<br />SHALL SUBMIT 7 SETS OF SUBMITTALS FOR REVIEW
<br />BE USED AND INSTALLED ON THIS PROJECT SHALL MAKE THE
<br />CW D, R —
<br />COD WATER (DROP) (RISER)
<br />PER HOUR
<br />RES LISTED AND THE MATERIAL TO
<br />AND ARCHITECT AT NO ADDITIONAL COST T❑ THE OWNER,
<br />(DROP) (RISER) (RETURN)
<br />MBH
<br />THOUSANDS OF BTU
<br />AS DIRECTED BY THE ENGINEER
<br />HW,D,R,RT
<br />— HW SUPPLY
<br />NOT IN PLUMBING CONTRACT
<br />THW —T
<br />— TEMPERED HOT WATER (115' F)
<br />NIPC
<br />FURNISH SHUTOFF VALVES WHERE SHOWN. SHUT OFF VALVES SHALL
<br />'K' BE RATED
<br />NATURAL GAS (PROPANE)<5PSI
<br />HW
<br />HAND WASH STATION
<br />= GROUND AND TYPE BELOW,
<br />STAINLESS STEEL BALL, AND DOUBLE O—RING STEM 1/4 TURN, VALVES TO
<br />CONNECTIONS. INSULATE HOT WATER SUPPLY AND
<br />_ G, LPG—
<br />PRESSURE GAS(PROPANE) >5PSI
<br />HS
<br />HOSE STATION
<br />PEON SEATS,
<br />;pVTDE DIELECTRIC UNIONS AT ALL DISSIMILAR METAL
<br />OF T-24 MANDATORY FEATURES.
<br />— HPG
<br />— HIGH
<br />HWG
<br />HOT WATER GENERATOR
<br />BERGLASS ASE MEETING THE REQUIREMENTS
<br />CONTRACTOR SHALL COORDINATE HIS WORK WITH
<br />— COMPRESSED AIR
<br />ESSBIBB
<br />BV
<br />BALL <5", BUTTERFLY >5" VALVE
<br />WATER LIZE AS INES PER AWA GUIDELINES AND PROVIDE THRON THE DRAWINGS. EE COPIES FROM AN
<br />TRADE OUTSIDE+
<br />PATHOGENS AT THE
<br />HB
<br />HOSE
<br />SOFT COD WATER LINE
<br />:ACTOR SHALL DISINFECT
<br />RTE3RSE BACTERIUM, SPORIDIUM AND OTHER
<br />STHELSBSTEMSPASSED FORTH
<br />©
<br />UNDER PLUMBING CONTRACT
<br />_SCW
<br />3, WATER ESE
<br />— SHW —
<br />SOFT HOT WATER LINE
<br />JD CERTIFY
<br />NOT TO EXCEED 100 PSIG, HOLD PRESSURE FOR 24 HOURS,
<br />SOV
<br />SHUT OFF VALVE
<br />WORKING PRESSURE FOR LEAKS,
<br />1.5 TIMES
<br />AND FITTINGS ABOVE AND BELOW GRADE, Cl PIPE WITH ESCUTCHEONS WHERE PROHIBITED BY
<br />EVERY 100 FT AND AT EACH CHANGE ❑F DIRECTION
<br />SCHEDULE
<br />aBS PIPE CLEANOUTS SHALL BE PROVIDED
<br />TO BUILDINGS 2 OR LESS STORIES IN HEIGHT AND CANNOT BE USED WITHIN
<br />IXTURE CONriECTION
<br />SANITARY WATER
<br />JURISDICTION
<br />PIPE IS LIMITED
<br />ISE OF ABSPIPE
<br />LINES SHALL BE SLOPED AT A MINIMUM OF 1/4' PER 1',
<br />G
<br />P�15�
<br />SEWER VENT COLD HOT
<br />_S, ALL SE
<br />LOSET
<br />FV 3" 1 2" 1"
<br />
|