My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
2300 - Underground Storage Tank Program
>
PR0231948
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2022 2:59:09 PM
Creation date
4/26/2021 11:16:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231948
PE
2361
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SPEEDWAY) #68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
01
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQI II N Environmental Health Department <br /> C-01-1NTY I� <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> TESORO(SPEEDWAY)68153 2448 W KETTLEMAN LN, LODI May 10, 2021 <br /> Other Violations <br /> 2010 See below Unlisted General violation ❑V ❑R ❑COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> Overall Inspection Comments: <br /> On site for the monitoring system certification. The testing was not witnessed in its entirety. Looked inside all <br /> sumps and UDCs. Verified proper sensor locations. Verified spill container 5 gallon capacity and one hour <br /> hydrostatic test- passed. Paperwork inspection is still needed. <br /> An inspection checklist was provided to the facility operator at the time of inspection. The inspector will provide a <br /> complete report after paper work inspection to the facility operator within the next few weeks. <br /> Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br /> documenting the corrective actions that have been or will be taken for each violation, and any supporting <br /> paperwork, within 30 days of receiving the complete inspection report. <br /> AFTER THE COMPLIANCE DATE, EHD WILL BILL FOR ALL TIME AND ACTIVITIES ASSOCIATED WITH BRINGING <br /> THIS FACILITY BACK INTO COMPLIANCE. <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> Received by: Date: May 10, 2021 Inspector: Inspector Phone: <br /> Printed Name and Title: PAUL NSO, EH Specialist (209)616-3049 <br /> Grace Keller, Store Manager <br /> FA0003855 PR0231948 SCO01 05/10/2021 <br /> EHD 23-01 Rev.9/16/2020 Page 4 of 4 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.