My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2021 10:24:51 AM
Creation date
4/28/2021 8:37:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) Diesel Unleaded <br /> Are both vent and tank riser piping ❑ Yes ❑ Yes ❑ Yes ❑ Yes <br /> secondarily contained? ❑✓ No ❑✓ No ❑ No ❑ No <br /> OPE Model 61-SO 61-SO <br /> What is the OPE response when activated? ❑✓ Shut off ❑✓ Shut off ❑ Shut off ❑ Shut off <br /> (Check all that apply.) Flow Flow Flow Flow <br /> El Restricts ❑Restricts ❑Restricts ❑Restricts <br /> Flow Flow Flow Flow <br /> ❑ Audible ❑ Audible ❑ Audible ❑ Audible <br /> Alarm Alarm Alarm Alarm <br /> ❑ Visual ❑ Visual ❑ Visual ❑ Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping ❑ Yes ❑ Yes ❑ Yes ❑ Yes <br /> that may interfere with the OPE operation? ❑✓ No ❑✓ No ❑ No ❑ No <br /> At what level in the tank is the OPE set to <br /> 81.5" 83" <br /> activate? (Inches from bottom of tank) <br /> What is the percent capacity of the tank at <br /> 90% 92% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to ❑✓ Yes ❑✓ Yes ❑ Yes ❑ Yes <br /> respond when the stored substance ❑ No ❑ No ❑ No ❑ No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> ❑✓ Pass ✓❑ Pass El Pass El Pass <br /> OPE Inspection Results ❑ Fail ❑ Fail ❑ Fail ❑ Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> * Mark here if: <br /> ❑ Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.