Laserfiche WebLink
Appendix A PGE095 Unleaded <br /> 71 SO Overfill Valve Upper Tube Calculation Worksheet <br /> Important: This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisdic- <br /> tion (AHJ)and review local,state,and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region,as well as take into account other considerations such as extreme tank tilt. <br /> Desired tank capacity for shut-off: NOTE: Fill in the current shut-off percentage after calculations SO%=91.892% <br /> Dipstick Number on Tank Chart that corresponds to 100%volume(Y)= 96 (Y) <br /> Dipstick Number on Tank Chart that corresponds to SO% (X)_ — 83" (X) <br /> Upper Tube Reference Number Z=Y-X 13" 2 (Z) <br /> - <br /> Upper Tube Depth Inside Tank C=Z-2" <br /> 11" (C) <br /> Distance from top sealing surface for 71 SO Lip' to inside the <br /> top of Storage Tank2 A=_44" <br /> For Non-Testable 71 SO models only NOTE: Use this section if the valve body is less than 6 1/2"into the tank <br /> In all cases for non-testable 71 SO models,the top of the valve body must protrude at least 6'/2"into the tank to <br /> provide a minimal clearance for proper operation.' Additionally the total Upper Tube Length must beat least 16" <br /> of length to include the protective bend in the tube. <br /> Is C less than 6'/2" No <br /> If NO,Upper Tube Length (D)=C+A <br /> If YES,Upper Tube Length (D)=6'/2"+A <br /> Upper Tube Length= 55" <br /> For Testable 71 SO models only <br /> In all cases for Testable 71 SO models,the top of the valve body must protrude at least 6'/2"into the tank to provide <br /> a minimal clearance for proper operation.' Additionally the total Upper Tube Length must beat least 14'/2"of <br /> length to include the protective bend in the tube. <br /> Is C less than 5" Yes / No <br /> If NO,Upper Tube Length (D)= C+A- 1 1/2" <br /> If YES,Upper Tube Length (D)=61/2"+A- 1 1/2" <br /> Upper Tube Length= <br /> Sealing surface may be the top of the Face Seal Adaptor,the built in sealing ledge inside some spill containers,or on non- <br /> vapor tight applications the top of the pipe nipple <br /> 2 Some Underground Storage tanks utilize a man way system at the top. Make sure to use the top ofthe storage tank for <br /> measurement and not to top of the man way. Consult your underground tank manufacturer for height of the man way <br /> 3 This measurement is taken from the seam where the upper tube is attached to the valve body to the inside of the tank top. <br /> 20 <br />