Laserfiche WebLink
Permit #SR0083895 / Two Guys / 7/23/2021 <br /> Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ® Manufacturer E] Industry Standard El Professional Engineer <br /> Test Type El Pressure ® Vacuum 0 Hydrostatic <br /> Test Equipment Used: <br /> Tank ID Diesel <br /> Tank Manufacturer <br /> Tank Capacity <br /> Test Start Time 0 min <br /> Initial Reading 2 PSI <br /> Test End Time sa min <br /> Final Reading 2 PSI <br /> Change in Reading o <br /> Pass/Fail Criteria Pass <br /> Tightness Test Results M Pass Fail ® Pass Fail ® Pass El Fail Pass Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by Manufacturer ® Industry Standard E] Professional Engineer <br /> Test Type Pressure ® Vacuum ® Hydrostatic <br /> Test Equipment Used: <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ® Pass r] Fail ® Pass ® Fail ® Pass Ej Fail ® Pass ® Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results El Pass ® Fail (! Pass ® Fail ® Pass E] Fail E! Pass ® Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />