My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALLOWAY
>
4079
>
1900 - Hazardous Materials Program
>
PR0546823
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 2:49:09 PM
Creation date
4/28/2021 1:19:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0546823
PE
1921
FACILITY_ID
FA0026518
FACILITY_NAME
HORIZON OXYGEN & MEDICAL EQUIPMENT INC
STREET_NUMBER
4079
STREET_NAME
CALLOWAY
STREET_TYPE
CT
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4079 CALLOWAY CT
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERS Consolidated Emergency Response / Contingency Plan <br />H. EARTHQUAKE VULNERABILITY <br />Identify ares of the facility that are vulnerable to hazardous materials releases due to seismic motion. These areas require immediate isolation and inspection. <br />VULNERABLE AREAS (Check all that apply): e111 LOCATIONS (e.g., Shop, outdoor shed, lab): 112. <br />M 1. HAZARDOUS MATERIALS AND/OR WASTE STORAGE AREAS Rear roll up door (East Side) to the left (South Side) In Cage. <br />❑ 2. PROCESS LINES AND PIPING <br />❑ 3. LABORATORY <br />❑ 4. WASTE TREATMENT AREA <br />Identify mechanical systems vulnerable to releases / spills due to eatlh uake-related motion. These systems re vire immediate isolation and inspection. <br />VULNERABLE SYSTEMS AND/OR EQUIPMENT (Check all that apply): H3. j LOCATIONS: H4. <br />❑ 1. SHELVES, CABINETS AND/OR RACKS 1 Portable Cylinders- South East <br />❑ 2. TANKS AND SHUT-OFF VALVES Gas Shutoff on South of Building 4075. For all units. <br />❑E 3. PORTABLE GAS CYLINDERS Electrical Panel Shutoff West of warehouse See Exit Route <br />RE 4. EMERGENCY SHUT-OFF AND/OR UTILITY VALVES : Sprinklers through out the building. Shutoff valve in Electrical <br />room on the south side of building. <br />❑E 5. SPRINKLER SYSTEMS <br />❑ 6. STATIONARY PRESSURIZED CONTAINERS (e.g., Propane tank) <br />I. EMPLOYEE TRAINING <br />Employee training is required for all employees and/or contractors handling hazardous materials and/or hazardous wastes during normal and/or emergency operations. <br />Most facilities will need to submit a separate Training Plan. However, your CUPA may accept this section as the Training Plan for some small facilities. <br />Employee training plans may include the following content: <br />Applicable laws and regulations; • Communication and alarm systems; <br />Emergency response plans and procedures; • Personal protective equipment; <br />Safety Data Sheets; • Use and maintenance of emergency response equipment and supplies <br />• Hazard communication related to health and safely; (e.g. Fire extinguishers, respirators, spill control materials); <br />• Methods for safe handling of hazardous substances; • Decontamination procedures; <br />e Hazards of materials and processes (e.g., fire, explosion, asphyxiation); • Evacuation procedures and evacuation staging locations; <br />e Hazard mitigation, prevention and abatement procedures; • Identification of facility areas, equipment, and systems vulnerable to <br />• Coordination of emergency response actions; earthquakes and other named disasters. <br />• Notification procedures for local emergency responders, CUPA, • OTHER (Specify): <br />Cal OES, and onsite personnel; <br />Check the applicable boxes below to indicate how the employee training program is administered. <br />❑E L FORMAL CLASSROOM ❑t. 2. VIDEOS 9 3. SAFETY MEETINGS [E4. STUDY GUIDES /MANUALS 11. <br />❑ 5. OTHER (Specify): 12. <br />❑ 6. NOT APPLICABLE SINCE FACILITY HAS NO EMPLOYEES <br />❑ 7. CHECK IF A SEPARATE EMPLOYEE TRAINING PLAN IS USED AND UPLOADED TO CERS AS A PDF DOCUMENT 13. <br />❑ S. CHECK IF EMPLOYEE TRAINING IS COVERED BY THE ABOVE REFERENCED CONTENT AND OTHER DOCUMENTS ONSITE 14. <br />EMPLOYEE TRAINING FREQUENCY AND RECORDKEEPING TRAINING MUST BE: <br />• Provided initially for new employees as soon as possible following the date of hire. New employees should not work in an unsupervised position that involves <br />hazardous materials handling and/or hazardous waste management without proper training; <br />• Provided within six months from the date of hire for new employees at a large quantity generator; <br />• Ongoing and provided at least annually; <br />• Amended prior to a change in process or work assignment; <br />• Given upon modification to the Emergency Response/Contingency Plan. <br />Large Quantity Generator Training: Large quantity generators (1,000 kg or more) must retain written plan and documentation of employee training which includes: <br />• A written description of the type and amount of both initial and ongoing training that will be given to persons filling eachjob position having responsibility for hazardous <br />waste management and/or emergency response. <br />• The name, job title and job description for each position at the facility related to hazardous waste management. <br />• Current employee training records must be retained until closure of the facility and former employee training records must be retained for at least three years after <br />termination of employment. <br />Small Quantity Generator Training: Small quantity generators (less than 1,000 kg) must include basic hazardous waste management and emergency response <br />procedures but a written employee training plan and training records are not required. In order to show that the facility has met the small quantity generator employee <br />training requirement, an employee training plan and training records may be made available. <br />Hazardous Materials Business Plan Training: Businesses must provide initial and annual employee training that includes the content referenced above. The training <br />may be based on the job position and training records must be made available for a period of at least three years. <br />J. LIST OF ATTACHMENTS <br />Check one of the following: rl. <br />❑ 1. NO ATTACHMENTS ARE REQUIRED; or <br />❑ 2. THE FOLLOWING DOCUMENTS ARE ATTACHED: rz <br />Rev. Io/Is/ta Page 4 f4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.