My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
550
>
2300 - Underground Storage Tank Program
>
PR0536555
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 10:55:49 AM
Creation date
4/29/2021 10:35:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0536555
PE
2351
FACILITY_ID
FA0020989
FACILITY_NAME
Arco. Am pm 83333
STREET_NUMBER
550
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
Rd
City
Tracy
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
550 W Valpico Rd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacificwest Petroleum Inc. (ARCO am pm # 83333) Monitoring Certification 2021 <br />IV0000 <br />OCT 20, 2021 12:00 PM <br />ARCO am/ppm 83333 <br />550 W Valpico Ave <br />Tracy <br />CA 95376 <br />ISD MONITORING TEST PASS/FAIL THRESHOLDS <br />VAPOR COLLECTION BALANCE SYS FLOW PERFORMANCE <br />VAPOR CONTAINMENT GROSS FAIL, 95th PERCENTILE <br />VAPOR CONTAINMENT DEGRADATION, 75th PERCENTILE <br />VAPOR CONTAINMENT LEAK DETECTION FAIL @2"WCG <br />STAGE I VAPOR TRANSFER FAIL, 50th PERCENTILE <br />VAPOR PROCESSOR SELF TEST FAIL <br />VAPOR PROCESSOR MASS EMISSION FAIL (LB/KGAL) <br />IV1000 <br />OCT 20, 2021 12:00 PM <br />ISD VERSION: 01.05 <br />190200 <br />OCT 20, 2021 12:00 PM <br />SOFTWARE REVISION LEVEL <br />VERSION 333.02 <br />SOFTWARE# 346333-100-C <br />CREATED - 12.08.10.11.22 <br />S -MODULE# 330160-004-a <br />SYSTEM FEATURES: <br />PERIODIC IN -TANK TESTS <br />ANNUAL IN -TANK TESTS <br />ISD/APM <br />120100 <br />OCT 20, 2021 12:00 PM <br />ARCO am/pm 83333 <br />550 W Valpico Ave <br />Tracy <br />CA 95376 <br />IN -TANK INVENTORY <br />PERIOD BELOW ABOVE <br />1DAYS <br />0.60 ---- <br />7DAYS <br />---- 1.30"wcg <br />30DAYS <br />---- 0.30"wCg <br />7DAYS <br />---- 13.00cfh <br />20MINS <br />---- 2.50"wcg <br />1DAYS <br />---- ---- <br />1DAYS <br />---- 0.32 <br />TANK <br />PRODUCT <br />VOLUME TC <br />VOLUME <br />ULLAGE <br />HEIGHT <br />WATER <br />TEMP <br />1 <br />87 <br />14447 <br />14388 <br />5335 <br />80.46 <br />0.00 <br />65.80 <br />2 <br />91 <br />8514 <br />8469 <br />3390 <br />78.66 <br />0.70 <br />67.45 <br />3 <br />DIESEL NO. <br />7030 <br />6986 <br />3241 <br />76.47 <br />0.94 <br />73.89 <br />160100 <br />OCT 20, 2021 12:01 PM <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.