Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for J & L MARKET as of September09 , 2021. <br /> Open violations from May 19, 2021 inspection <br /> Violation #104 - Failure to have an approved UST Monitoring Plan . <br /> OBSERVATION: The monitoring plan is not current and/or not approved by the EHD . The responsible party <br /> information is not current. <br /> REGULATION GUIDANCE: The monitoring plan must be uploaded to the California Environmental Reporting <br /> System (CERS ) . <br /> CORRECTIVE ACTION : Immediately log into CERS , make the necessary changes , and submit for review by the <br /> EHD . <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date) . <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #105 - Failure to have an approved UST Response Plan . <br /> OBSERVATION The response plan is not current and/or not approved by the EHD . The responsible persons are <br /> out-dated . <br /> REGULATION GUIDANCE: The response plan must be uploaded to the California Environmental Reporting System <br /> ( CERS ) . <br /> CORRECTIVE ACTION : Immediately log into CERS , upload the completed form , and submit for review by the EHD . <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #106 - Failure to submit and maintain a current facility plot plan / site map . <br /> OBSERVATION: An accurate UST Monitoring Site Plan was not submitted . The annular sensors were not included <br /> on the site plan . <br /> REGULATION GUIDANCE: A site plan must be submitted identifying the locations where monitoring will be <br /> performed. The site plan must show the general layout of tanks and piping and clearly identify locations of the <br /> following equipment, if installed : 1 ) monitoring system control panels ; 2 ) in-tank liquid level probes ( if used for leak <br /> detection ) ; 3 ) devices monitoring tank annular spaces or vault; 4 ) devices monitoring product piping ; 5 ) devices <br /> monitoring fill piping ; 6 ) devices monitoring vent piping ; 7) devices monitoring vapor recovery piping ; 8 ) devices <br /> monitoring vent/transition sumps ; 9 ) devices monitoring under-dispenser containment; 10 ) line leak detectors ; and <br /> 11 ) devices monitoring any other secondary containment areas . <br /> CORRECTIVE ACTION : Immediately log into the California Environmental Reporting System ( CERS ) at <br /> http : //cers. calepa . ca . gov/ and upload a copy of the UST Monitoring Site Plan . <br /> Page 1 of 3 <br />