Laserfiche WebLink
CONDOR EARTH <br /> SCHEDULE OF FEES <br /> 2021 <br /> STAFF MEMBER RATE PER HOUR($) <br /> PRINCIPALS/PROJECT MANAGEMENT <br /> SeniorPrincipal........................................................................................................................................245.00 <br /> Principal Tunneling Consultant................................................................................................................235.00 <br /> Principal Engineer/Geologist....................................................................................................................219.00 <br /> ProjectDirector........................................................................................................................................209.00 <br /> ConstructionManager..............................................................................................................................204.00 <br /> Project/Senior Manager............................................................................................................................184.00 <br /> TECHNICAL <br /> Senior Geotechnical Engineer..................................................................................................................209.00 <br /> Registered Geotechnical Engineer...........................................................................................................199.00 <br /> Certified Hydrogeologist/Engineering Geologist..................................................................................... 199.00 <br /> Senior Geologist/Engineer/Environmental Specialist.............................................................................. 189.00 <br /> Senior Process Safety Management Specialist.........................................................................................179.00 <br /> Unmanned Aerial System(UAS) Specialist.............................................................................................153.00 <br /> GISProgrammer/Analyst......................................................................................................................... 153.00 <br /> Process Safety Management Specialist.................................................................................................... 153.00 <br /> Resident Construction Inspector............................................................................................................... 153.00 <br /> Associate Geologist/Engineer/Environmental Specialist......................................................................... 153.00 <br /> Aboveground Storage Tank(AST)Certified Inspector............................................................................ 143.00 <br /> Staff Geologist/Engineer/Environmental Specialist................................................................................. 138.00 <br /> GISTechnician......................................................................................................................................... 128.00 <br /> EngineeringAssistant............................................................................................................................... 112.00 <br /> SeniorTechnician..................................................................................................................................... 107.00 <br /> Draftsperson............................................................................................................................................. 102.00 <br /> Technician..................................................................................................................................................87.00 <br /> MATERIALS TESTING* <br /> MTSI Project/Laboratory Manager.......................................................................................................... 128.00 <br /> Certified Welding Inspector..................................................................................................................... 122.00 <br /> SpecialInspector...................................................................................................................................... 102.00 <br /> Senior Materials Technician.......................................................................................................................97.00 <br /> MaterialsTechnician..................................................................................................................................82.00 <br /> SUPPORT STAFF <br /> SeniorProject Administrator.................................................................................................................... 133.00 <br /> Administrative Specialist..........................................................................................................................107.00 <br /> ProjectCoordinator..................................................................................................................................107.00 <br /> TechnicalEditor.........................................................................................................................................79.00 <br /> AdministrativeAssistant............................................................................................................................73.00 <br /> MISCELLANEOUS <br /> Overtime(all Saturday work is overtime)...................................................................................(1.3 times rate) <br /> Double-time(all Sundays and Holidays).....................................................................................(1.7 times rate) <br /> Litigation Support......................................................................................................................300.00—400.00 <br /> NON-LABOR CHARGES <br /> Vehicle charge.................................................................................................$55 per day plus 50 cents per mile <br /> Unit Charges per Condor Unit Fee Schedule <br /> Billable Field Equipment per Condor Billable Field Equipment Schedule <br /> Laboratory Charges per Condor Laboratory Fee Schedule <br /> *A 2-hour minimum charge will be applied to all field services,and a 4-hour minimum will be applied for the <br /> cancellation of work within 24 hours of scheduled field work. <br /> OUT-OF-POCKET EXPENSES <br /> Billed at cost plus 15% and includes such items as travel expenses, equipment rental, laboratory fees, <br /> subcontractors,postage and freight, subcontracted printing or reproduction fees, supplies, etc. <br /> PREVAILING WAGE <br /> A Refer to Condor Prevailing Wage Schedule of Fees <br /> CONDOR <br /> X:\Office\Fonns\Contracts\Fee Schedules\2021 Fee Professional Consulting.docx <br />