Laserfiche WebLink
Elite IV Contractors <br />Date: lo/o8/2021 <br />Inspection Request: 10/13/2021, Wednesday @3:00 PM <br />SRoo836o1 <br />Inspection Site: <br />Quik Stop #144 <br />7272 West Lane Stockton, CA 95210 <br />Scope Of Work: <br />• Replace dispenser with conversion frame installation <br />• Cold start monitoring panel <br />• Converting existing 89 -Octane to 87 -Octane <br />A) Inspection for: Inspections: Sensor functionality: Functionality of the <br />monitoring system must be verified to ensure that monitoring has been <br />restored. A copy of the alarm history shall be printed prior to performing the cold <br />start of the monitoring panel and made available at the time of EHD inspection. <br />B) Verification of the dispenser footprints contained by the under -dispenser <br />containment sumps (UDC's). Any potential leaks from piping within the <br />dispensers. <br />C) Visual inspection of the piping within the dispensers. <br />Thank you, <br />Deborah ones <br />Administrative Assistant <br />Elite /V Contractors <br />dispatch@eliteiv.com <br />(209) 461-6337 (work) <br />(209) 461-6342 (fax) <br />Phone: (209)461-6337 Fax:(209)461-6342 I 2535 Wigwam Dr. Stockton, CA 95205 <br />Email: dispatch@eliteiv.com <br />