My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7272
>
2300 - Underground Storage Tank Program
>
PR0231939
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2023 1:01:54 PM
Creation date
5/4/2021 8:10:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231939
PE
2361
FACILITY_ID
FA0002570
FACILITY_NAME
QUIK STOP MARKET #144
STREET_NUMBER
7272
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
094-040-13
CURRENT_STATUS
01
SITE_LOCATION
7272 WEST LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANJ O A U I N Environmental Health Department <br /> _ COUNTY , _ .. . = IV <br /> RECE ED <br /> UST SYSTEM RETROFIT OR REPAIR APR 2 22021 <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br /> 1 . Site map enclosed? YES [ ] NO [ ] ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br /> 2 . Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training <br /> certificates for each person installing or testing any component that is repaired or replaced . Ensure a copy of <br /> the "Site Health and Safety Plan" is available on the jobsite as required by Title 8 . <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing location of repairs and/or replacements . If repairing a component, describe <br /> how this will be done . ( If adding piping , UDC 's, or other UST equipment, or performing tank top upgrade , <br /> use the UST Installation Application pages 4-8 as necessary for a timely plan review) : <br /> Remove (3) Existing Straight grade Gilbarco Advantage Dispensers <br /> Replace with (3) Gilbarco Encore 700S Series Blender Dispensers <br /> Installing (3) Bravo Conversion Frames <br /> Converting existing 89 Octane/10 , 000 Gallon UST to 87 Octane. <br /> Manifold existing 89 product line to 87 product line above shear valve in the UDC . <br /> Program Veeder- Root to running the two 87 turbines to turn-on sequentially. Updating Software on Veeder-Root. <br /> Possible Cold-Start <br /> 4 . List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval) : <br /> (3) Gilbarco Encore 700S Series Blender Dispensers <br /> (3) Bravo Conversion Frames <br /> 5 . Decontamination Procedures : <br /> a . Will piping be decontaminated prior to removal ? YES [ ] NO [ ] <br /> b. Identify contractor performing decontamination : <br /> Name Phone ( ) <br /> Address City Zip <br /> 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.