My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 10:47:59 AM
Creation date
5/4/2021 9:08:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231488
PE
2361
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
2501 JACKSON AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Overfill Prevention Equipment Inspection Report Form <br />6. OVERFILL PREVENTION EQUIPMENT DETAILS <br />Ta n k I D (One OPE per column) <br />87 <br />91 <br />DSL <br />Are both vent and tank riser piping <br />❑ Yes <br />❑ Yes <br />❑ Yes <br />❑ Yes <br />secondarily contained? <br />E No <br />E No <br />E No <br />❑ No <br />OPE Model <br />Philtite <br />Philtite <br />Philtite <br />Tank Manufacturer <br />Xerxes <br />Xerxes <br />Xerxes <br />❑ Shuts off <br />❑ Shuts off <br />❑ Shuts off <br />❑ Shuts off <br />Flow <br />Flow <br />Flow <br />Flow <br />E Restricts <br />E Restricts <br />E Restricts <br />❑ Restricts <br />What is the OPE response when <br />Flow <br />Flow <br />Flow <br />Flow <br />activated? <br />❑ Audible <br />❑ Audible <br />❑ Audible <br />❑ Audible <br />(Check a// that apply.) <br />Alarm <br />Alarm <br />Alarm <br />Alarm <br />❑Visual <br />❑Visual <br />❑Visual <br />❑Visual <br />Alarm <br />Alarm <br />Alarm <br />Alarm <br />Are flow restrictors installed on vent <br />❑ Yes <br />❑ Yes <br />❑ Yes <br />❑ Yes <br />piping that may interfere with the OPE <br />E No <br />E No <br />E No <br />❑ No <br />operation? <br />At what level in the tank is the OPE set to <br />83 1/2" <br />83" <br />83 3/4" <br />activate? (Inches from bottom of tank) <br />What is the percent capacity of the tank in <br />over 95% <br />over 95% <br />over 95% <br />which the OPE activates? <br />Is the OPE in proper operating condition <br />E Yes <br />E Yes <br />E Yes <br />❑ Yes <br />to respond when the stored substance <br />❑ No <br />❑ No <br />❑ No <br />❑ No <br />reaches the designated regulatory level? <br />7. SUMMARY OF TESTING RESULTS <br />❑ Pass <br />❑ Pass <br />❑ Pass <br />❑ Pass <br />OPE Inspection Results <br />E Fail <br />E Fail <br />E Fail <br />❑ Fail <br />8. COMMENTS <br />All drop tubes failed as they were set at over 95% per regulation. All drop tubes will need to be <br />replaced and retested. <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.