Laserfiche WebLink
Inderground Storage Tank <br />6. TANK SECONDARY CONTAINMENT TEST (ANNULAR) <br />Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br />Test Type ❑ Pressure ® Vacuum ❑ Hydrostatic <br />Test Equipment Used: PEI/ RP1200/ 10Hg for 1 hr <br />Tank ID <br />87 <br />91/DSL <br />Tank Manufacturer <br />Unknown <br />Unknown <br />Tank Capacity <br />N/A <br />N/A <br />Test Start Time <br />10:15 <br />10:40 <br />Initial Reading <br />-10 <br />-10 <br />Test End Time <br />11:15 <br />11:40 <br />Final Reading <br />-10 <br />-10 <br />Change in Reading <br />0 <br />0 <br />Pass/Fail Criteria <br />0 <br />0 <br />0 <br />0 <br />Tightness Test Results <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />7. PIPE SECONDARY CONTAINMENT TEST (SEC LINE) <br />Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br />Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br />Test Equipment Used: PEI/ RP1200/ 5 psi for 1 HR <br />Pipe Run ID <br />87 <br />91 <br />DSL <br />Pipe Manufacturer <br />Unknown <br />Unknown <br />Unknown <br />Test Start Time <br />10:20 <br />10:30 <br />11:10 <br />Initial Reading <br />5 <br />5 <br />5 <br />Test End Time <br />11:20 <br />11:30 <br />12:10 <br />Final Reading <br />5 <br />5 <br />5 <br />Change in Reading <br />0 <br />0 <br />0 <br />Pass/Fail Criteria <br />0 <br />0 <br />0 <br />0 <br />Tightness Test Results <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Pipe Run ID <br />Pipe Manufacturer <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/Fail Criteria <br />0 <br />0 <br />0 <br />0 <br />Tightness Test Results <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Page 2 of 6 <br />