Laserfiche WebLink
> > Cc: <MInfurna@sjcehd.colu> <br />> > Sent: Friday, October 03, 2003 3:43 PM <br />> > Subject: Re: Monitoring Wells (1-4) Closure, Metropolitan <br />> StevedoreCompany <br />> > <br />> > <br />> > > I looked over the report, and Mike Infurna will do so next week. <br />» We <br />> > > will get back to you at that time. <br />> > > <br />> > > One question in the meantime: The report states that in 1991, <br />» only <br />> > > MW-1 and MW-4 were sampled. However, on page 8, in the text <br />below <br />» the <br />> > > table, there is a reference to a 1991sample result from MW-3 of <br />400 <br />> mg/1 <br />> > > sulfate. Thus, it appears MW-3 also was sampled in 1991. <br />> > > <br />> > > Can you shed any light on this? <br />> > > <br />> > > >>> "Jay R. Jahangiri" <treconsulting@comcast.net> 10/02/03 <br />> 11:19AM <br />> > > >>> <br />> > > <br />> > > <br />> > > Good Morning Wendy: <br />> > > <br />> > > Hope you had a good vacation and break away from work. <br />» Welcome <br />> > > back. <br />> > > <br />> > > As you know before you left for vacation, during August <br />2003, <br />> > > Metropolitan Stevedore Company (MSC) submitted a sampling and <br />> analysis <br />> > > report (SAR) for monitoring wells-1 through 4 located at their <br />> leased <br />> > > land area at the Port of Stockton to your attention. MSC is now <br />> waiting <br />> > > to close these four wells in place before it gives the subject <br />» leased <br />> > > parcel of land back to the Port of Stockton as the land owner. <br />> > > <br />> > > <br />> > > Per your request, MSC has gone above and beyond the call of <br />» duty <br />> > > and regulatory requirements and have completed the subject SAR, <br />» which <br />> > > does not reveal COCs at concentrations that would constitute an <br />> impact <br />> > > from MSC's operations or otherwise be inconsistent with the <br />> pre-existing <br />> > > historical use, concentration of COCs, and conditions of the <br />site. <br />> > > <br />> > > In view of the above, MSC is now experiencing delays in <br />> closing <br />> > > these four monitoring wells in place so the lease can be <br />properly <br />> > > terminated and this leased parcel of land can be returned to its <br />> > > rightful owner (The Port). As such, MSC respectfully requests <br />that <br />> an <br />> > > approval for "further actions" is granted from your office, so <br />MSC