Laserfiche WebLink
PRE-TANK REPLACEMENT Site Assessment Work Plan <br />4315 Waterloo Road Stockton, CA. <br />Aegis Project No. 89-047 <br />Page 20 <br />D. SITE SAFETY WORK PLAN <br />PERSONNEL <br />Team Member(list) <br />Responsibility <br />Michael Narmi <br />Site Coordinator <br />Michael Narmi <br />Project Geologist <br />Brian Garber Site Safety Officer <br />Perimeter Establishment: <br />Map/Sketch Attached? Yes xx No Site Secured? Yes No XX <br />Perimeter Identified? Yes XX No Zero line defined? Yes No XX <br />Free Product? Yes No Dissolved Product? Yes No <br />INVESTIGATION-DERIVED MATERIAL DISPOSAL: <br />Soil removed from the borings will be placed in Department of <br />Transportation approved barrels. The barrels will be sealed and <br />labeled with the boring number and depth intervals from which the <br />material originated, the date and Aegis job number. A drummed soil <br />worksheet will be generated at the time of drilling. Two composite <br />samples will be obtained from each boring. One sample will be analyzed <br />for TPH, total lead, inorganic lead and organic lead. The remaining <br />sample will be frozen and retained by the laboratory for further <br />testing, if required to classify drummed soil. Any material disposed <br />off-site will be disposed of in accordance with existing regulation <br />and guidelines.