Laserfiche WebLink
PROJECT NAME/LOCATION: <br />SHELL STATION <br />4215 WATERLOO ROAD <br />STOCKTON, CA <br />PROJECT <br />NUMBER: 89-047 <br />BORING <br />NUMBER: SB-6 SHEET 1 OF 1 <br />CONTRACTOR: <br />B + F DRILLING CO. <br />DRILLING <br />METHOD: HSA 6" <br />DRILLER: <br />BOB GANSBERG <br />DRILLING <br />RIG: MOBIL B61 <br />LAND OWNER: START DATE: -: COMPLETED: - <br />SHELL OIL TIME: TIME: <br />STSNBC SI SR <br />AYAULO AN AE GENERAL <br />MPMMOU MT MCDEPTH DESCRIPTION OF MATERIALS PID OBSERVATION <br />PEPBWN PV PO (ft.) AND CONDITIONS (PPm) NOTES <br />L LE TLA LV <br />E ER SELE Surface: 4" ASPHALT, 4" AB <br />2.5 0 — — <br />0.D — — <br />SS — — <br />— -- <br />- — <br />" SB6 4 3.5' 18" 5 --SILTY CLAY: Light brown, —0 No gasoline <br />/A 18 to --hard, dry (CL) — odor <br />39 5.0' --(Hardpan) — <br />— -- <br />- — Mild <br />" SB6 5 8.5' " 10 --SILTY CLAY: light brown, 25 degraded gas <br />/B 9 to --medium-hard, dry (CL) -- odor <br />14 10.0' — — <br />— — <br />— — <br />" SB6 3 13.5' " 15 --SILTY CLAY: light brown, —0 No odor <br />/C 4 to --soft, dry (CL) — <br />7 15.0' --TOTAL DEPTH = 16.5' FEET -- <br />-- — <br />— — <br />20 — -- <br />- -- <br />- — <br />— -- <br />- -- <br />25 — — <br />— — <br />— — <br />— — <br />— — <br />30 — — <br />— — <br />— — <br />Field Notes: <br />SS = Split Spoon Sample Aegis <br />All borings backfilled to surface with Environmental <br />cemented sand slurry. Consultants <br />Logged By: MIKE NARMI