My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2130
>
2900 - Site Mitigation Program
>
PR0528096
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2021 3:40:44 PM
Creation date
5/4/2021 3:30:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0528096
PE
2950
FACILITY_ID
FA0019024
FACILITY_NAME
REG/US BIODIESEL
STREET_NUMBER
2130
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2130 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joasi,un County Environmental Health Divisiori <br />June 20, 2008 <br />Page 7 <br />Schedule <br />BC is currently scheduled to perform the field sampling activities on July 10 and on <br />July 11, 2008; however, the sampling will not commence until issuance of the SJCEHD <br />drilling permit. The field sampling activities are anticipated to require two days, with the <br />first day reserved for subsurface utility clearance and collection of groundwater <br />monitoring well samples, and the second day for the advancement of the four soil <br />borings. The additional surface soil samples will be collected during both field days, as <br />time permits. The geophysical survey is tentatively scheduled to be performed on July 1 <br />and July 2, 2008, with the potential potholing performed in conjunction with the field <br />sampling activities. The final report documenting the Phase II investigation will be <br />submitted to SJCEHD approximately four weeks following the field activities. KEG will <br />not seek a written response from SJCEHD regarding the results of this investigation. <br />Thank you for reviewing this Phase II investigation work plan. Should you have any <br />questions regarding this work plan or its enclosures, please contact met at 925.210.2383. <br />Very truly yours, <br />BROWN AND CALDWELL <br />Ja n Grant, P.E. <br />Project Manager <br />JG:dt <br />cc: Tom Mowrer, KEG <br />Carol Denning, USBG <br />Jason Cashman, Port of Stockton <br />Don Trueblood, Brown and Caldwell <br />Enclosures (5) <br />Figure 1. Site Map <br />SJCEHD Well Permit Application, including check for $383 <br />SJCEHD MFR <br />Port of Stockton Site Access Agreement <br />BC HASP <br />P:1135000 \ 135531-USEDG Phase II InvesTinal DocumentsIFinal REG Phase II Work Plan 052808.doc\dt
The URL can be used to link to this page
Your browser does not support the video tag.