My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2130
>
2900 - Site Mitigation Program
>
PR0528096
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2021 3:40:44 PM
Creation date
5/4/2021 3:30:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0528096
PE
2950
FACILITY_ID
FA0019024
FACILITY_NAME
REG/US BIODIESEL
STREET_NUMBER
2130
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2130 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_TH AND SAFETY PLAN HEA <br />8. TRAINING REQUIREMENTS <br />BC Site personnel, including subcontractors and visitors conducting work in controlled areas of the <br />Site, must have completed the appropriate training as required by 29 CFR 1910.120. In addition, the <br />SSO will have completed the 8-hour Site Supervisor course, have current training in first aid and <br />CPR, and any additional training appropriate to the level of site hazards. Further site-specific <br />training will be conducted by the SSO prior to the initiation of project activities. This training will <br />include, but will not necessarily be limited to, emergency procedures, site control, personnel <br />responsibilities, and the provisions of this HASP. Each employee will document that the have been <br />briefed on the hazards identified at the site and that they have read and understand the requirements <br />of this HASP by signing the H&S Plan Acknowledgement Form attached as Appendix C. <br />A daily morning briefing to cover safety procedures and contingency plans in the event of an <br />emergency is to be included with a discussion of the day's activities. These daily meetings will be <br />recorded on the Daily Tailgate Safety Meeting Form. A copy of the Daily Tailgate Safety Meeting <br />Form is induded in Appendix D. <br />BROWN AND CALDWELL <br />8-1
The URL can be used to link to this page
Your browser does not support the video tag.