My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2130
>
2900 - Site Mitigation Program
>
PR0528096
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2021 3:40:44 PM
Creation date
5/4/2021 3:30:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0528096
PE
2950
FACILITY_ID
FA0019024
FACILITY_NAME
REG/US BIODIESEL
STREET_NUMBER
2130
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2130 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lally Tailgate Meeting Form <br />Page of <br /> <br />Name of Project/Site: Project No: <br />Project/Site Location: <br />Employee Completing Form: <br />(Print and Sign): <br />Date: <br />Employee Acknowledgement: <br />The following signatures indicate that these personnel have read and/or been briefed on this Health and <br />and understand the potential hazards/controls for the work to be performed. <br />Important Notice to Subcontractor(s): <br />Safety (H&S) Plan <br />and equipment as necessary to protect their <br />as well as manufacturer's specifications. Any <br />operations and employees for the determination <br />provide BC with a copy of their own H&S Plan for <br />respect to the activities of BC's own employees at <br />and general site hazards. The subcontractor <br />For example, BC's H&S Plan does not <br />(e.g., operation of a drill rig, excavator, crane or <br />personnel are expected to comply fully with <br />in the BC H&S Plan. Failure to do so may result in <br />Subcontractors are responsible for developing, maintaining, and implementing their own health and safety programs, policies, procedures <br />workers, and others, from their activities. Subcontractors shall operate equipment in accordance with their standard operating procedures <br />project monitoring activities conducted by BC at the Site shall not in any way relieve subcontractors of their critical obligation to monitor their <br />of exposure to hazards that may be present at the Site and to provide required guidance and protection. If requested, subcontractors will <br />this project or other health and safety program documents for review. <br />BC's Health and Safety Plan has been prepared specifically for this project and is intended to address health and safety issues solely with <br />the site. A copy of BC's H&S Plan may be provided to subcontractors in an effort to help them identify expected conditions at the site <br />shall remain responsible for identifying and evaluating hazards at the site as they pertain to their activities and for taking appropriate precautions. <br />address specific hazards associated with tasks and equipment that are particular to the subcontractor's scope of work and site activities. <br />other equipment). Subcontractors are not to rely on BC's H&S Plan to identify all hazards that may be present at the Site. Subcontractor <br />subcontractors Health and Safety Plan and to observe the minimum safety guidelines applicable to their activities which may be identified <br />the removal of the subcontractor or any of the subcontractor's workers from the job site. <br />Print Sign Date Print Sign Date <br />Plan of the Day <br />(Describe the activities that are planned to be performed today) <br />Potential Hazards and Topics Discussed <br />(Describe the potential hazards and controls that may be associated with planned activities) <br />0 Electrical E Chemical 1:1 Biological II Physical II Other (specify): <br />Distribution. Original — Project File HS-17 REV. 06/2006
The URL can be used to link to this page
Your browser does not support the video tag.