My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
7373
>
2900 - Site Mitigation Program
>
PR0537728
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2021 4:31:02 PM
Creation date
5/4/2021 4:26:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0537728
PE
2950
FACILITY_ID
FA0021746
FACILITY_NAME
KAISER PERMANENTE
STREET_NUMBER
7373
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
9510
APN
09416023
CURRENT_STATUS
01
SITE_LOCATION
7373 WEST LN
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
dre April 2013 <br />Project No. 1301-0621 associates, Inc. <br />„ ENGINEERS, GEOLOGISTS <br />LJ ENVIRONMENTAL SCIENTISTS <br />APPENDIX A <br />SITE HEALTH AND SAFETY PLAN <br />Project Title: Soil Assessment Activities at Kaiser Permanente Facility, Stockton, San <br />Joaquin County, California. <br />Project Address: <br />Project Manager: <br />Project Supervisor: <br />Office Phone: <br />7373 West Lane, Stockton, California. <br />Alan Churchill <br />Alan Churchill <br />(916) 857-1601 (Sacramento Office) <br />Cell Phone: (916) 952-5421 <br />Cell Phone: (916) 952-5421 <br />INTRODUCTION <br />The purpose of this Site Health and Safety Plan (HSP) is to establish requirements for <br />protecting the health and safety of site workers for the above-referenced project. The HSP <br />contains safety information, instructions, and procedures. <br />ORGANIZATION <br />The following personnel are designated to carry out the stated job functions pertaining to <br />the site activities. All site personnel have read this safety plan and are familiar with its provisions. <br />Site Safety Officer: <br />Project Team Leader: <br />Field Team Leader: <br />Field Personnel: <br />Field Personnel: <br />Driller Operator: <br />Operator Helper: <br />Work was <br />exceptions: <br />Name <br />Alan Churchill <br />Alan Churchill <br />Alan Churchill <br />Alan Churchill <br />Alan Klein <br />Signature <br /> <br />accomplished in accordance with the Site Safety Plan, with the following <br />Site Safety Officer: <br />Date: <br />(RETURN ORIGINAL COPY TO JOB FILE WITH SIGNATURES) <br />13 0621 _Kaiser Stockton_TWP-HSP <br />- A1 -
The URL can be used to link to this page
Your browser does not support the video tag.