My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PORT
>
2323
>
2900 - Site Mitigation Program
>
PR0545818
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2021 5:21:24 PM
Creation date
5/4/2021 5:16:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0545818
PE
2965
FACILITY_ID
FA0009156
FACILITY_NAME
CALAMCO
STREET_NUMBER
2323
Direction
W
STREET_NAME
PORT
STREET_TYPE
RD
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
02
SITE_LOCATION
2323 W PORT RD G
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT C <br />Storm Water Pollution Prevention Plan <br />A Storm Water Pollution Prevention Plan (SWPPP) shall be developed and implemented by <br />the Discharger. The SWPPP shall be designed to comply with BAT/BCT and be certified in <br />accordance with the signatory requirements of Standard Provision D.6. The SWPPP shall be <br />retained on-site and made available upon request of a representative of the Regional Water <br />Quality Control Board and/or local storm water management agency (local agency) which <br />receives the storm water discharge. <br />The Regional Water Quality Control Board and/or local agency may notify the Discharger <br />when the SWPPP does not meet one or more of the minimum requirements of this section. <br />Within 30 days of notice, the Discharger shall submit a time schedule that meets the <br />minimum requirements to this section to the Regional Board andior local agency that <br />requested the changes. After making the required changes, the Discharger shall provide <br />written certification that the changes have been made. <br />The Discharger shall amend the SWPPP whenever there is a change in construction, <br />operation, or maintenance which may effect the discharge of significant quantities of <br />pollutants to surface water, ground water, or the local agency's storm drain system. The <br />SWPPP should also be amended if it is in violation of conditions of the permit, or has not <br />achieved the general objectives of controlling pollutants in the discharges. <br />The SWPPP shall provide a description of potential sources which may be expected to add <br />significant quantities of pollutants to storm water discharges, or which may result in non- <br />storm water discharges from the facilities. The SWPPP shall include, at a minimum, the <br />following items: <br />A map extending approximately one-quarter mile beyond the property boundaries of <br />the facility showing: the facility, general topography, surface water bodies (including <br />known springs and wells), and the discharge point(s) where the facility's storm water <br />discharges to a municipal storm drain system or other water body. The requirements of <br />this paragraph may be included in the site map required under the following paragraph <br />if appropriate. <br />A site map showing: <br />i. The storm water conveyance and discharge structures.; <br />An outline of the storm water drainage ares for each storm water discharge point; <br />Paved areas and buildings; <br />Areas of pollutant contact, actual or potential;
The URL can be used to link to this page
Your browser does not support the video tag.