Laserfiche WebLink
Attachment C <br />housekeeping, material material management practices, inspections, and maintenance and repair <br />measures. Periodic dates for training should be identified. <br />h. Inspections. All inspections, visual observations and sampling as required in the <br />Monitoring and Reporting Program, shall be done by trained personnel. A tracking or <br />follow-up procedure shall be used to ensure appropriate response has been taken in <br />response to these activities. <br />Non-storm water discharges to the storm water conveyance system shall be eliminated. If <br />they are not eliminated prior to implementation of the SWPPP, the Discharger shall notify <br />the appropriate Regional Water Quality Control Board prior to implementation of the <br />SWPPP that non storm water discharges cannot be eliminated. The notification shall include <br />a proposed time schedule for elimination of non-storm water discharges. In no case shall the <br />elimination of non-storm water discharges exceed three years from the date of the permit. <br />The SWPPP shall include the signature and title of the person responsible for preparation of <br />the SWPPP and include the date of initial preparation and each amendment, thereto.