Laserfiche WebLink
Underground Storage Tank <br /> Overt ll Prevention Equipment Inspection Report <br /> 6 . OVERFILL' PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) ` T- I /Diesel T- 1 /Diesel <br /> Are both vent and tank riser piping m Yes m Yes ❑ Yes ❑ Yes <br /> secondarily contained ? ❑ No ❑ No ❑ No ❑ No <br /> OPE Model EBW Pnumercato <br /> What is the OPE response when activated ? m Shut off ❑ Shut off ❑ Shut off ❑ Shut off <br /> (Check all that apply. ) Flow Flow Flow Flow <br /> ❑ Restricts ❑ Restricts ❑ Restricts ❑ Restricts <br /> Flow Flow Flow Flow <br /> ❑ Audible m Audible ❑ Audible ❑ Audible <br /> Alarm Alarm Alarm Alarm <br /> ❑ Visual m Visual ❑ Visual ❑ Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping ❑ Yes ❑ Yes ❑ Yes ❑ Yes <br /> that may interfere with the OPE operation ? m No m No ❑ No ❑ No <br /> At what level in the tank is the OPE set to 45 . 50 40 . 25 <br /> activate ? Inches from bottom of tank <br /> What is the percent capacity of the tank at <br /> 98 . 50 90 <br /> which the OPE activates ? <br /> Is the OPE in proper operating condition to ❑ Yes m Yes ❑ Yes ❑ Yes <br /> respond when the stored substance m No ❑ No ❑ No ❑ No <br /> reaches the designated regulatory level ? <br /> 7 . SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results ❑ Pass m Pass ❑ Pass ❑ Pass <br /> m Fail ❑ Fail ❑ Fail 0 Fail <br /> 8 . COMMENTS <br /> Describe all results marked "Fail' and each proposed remedy. <br /> EBW is currently set to shut off at 98 . 50 percent <br /> * Mark here if. <br /> ❑ Flow restrictors interfere with overfill prevention and equipment repairs required . <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In - Tank Setup report(s) <br /> Page 2 of 2 <br />