My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DE VRIES
>
13850
>
2300 - Underground Storage Tank Program
>
PR0231547
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2021 10:51:43 AM
Creation date
5/5/2021 2:29:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231547
PE
2361
FACILITY_ID
FA0003848
FACILITY_NAME
Verizon Business: KINGCA
STREET_NUMBER
13850
Direction
N
STREET_NAME
DE VRIES
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05524018
CURRENT_STATUS
01
SITE_LOCATION
13850 N DE VRIES RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overt ll Prevention Equipment Inspection Report <br /> 6 . OVERFILL' PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) ` T- I /Diesel T- 1 /Diesel <br /> Are both vent and tank riser piping m Yes m Yes ❑ Yes ❑ Yes <br /> secondarily contained ? ❑ No ❑ No ❑ No ❑ No <br /> OPE Model EBW Pnumercato <br /> What is the OPE response when activated ? m Shut off ❑ Shut off ❑ Shut off ❑ Shut off <br /> (Check all that apply. ) Flow Flow Flow Flow <br /> ❑ Restricts ❑ Restricts ❑ Restricts ❑ Restricts <br /> Flow Flow Flow Flow <br /> ❑ Audible m Audible ❑ Audible ❑ Audible <br /> Alarm Alarm Alarm Alarm <br /> ❑ Visual m Visual ❑ Visual ❑ Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping ❑ Yes ❑ Yes ❑ Yes ❑ Yes <br /> that may interfere with the OPE operation ? m No m No ❑ No ❑ No <br /> At what level in the tank is the OPE set to 45 . 50 40 . 25 <br /> activate ? Inches from bottom of tank <br /> What is the percent capacity of the tank at <br /> 98 . 50 90 <br /> which the OPE activates ? <br /> Is the OPE in proper operating condition to ❑ Yes m Yes ❑ Yes ❑ Yes <br /> respond when the stored substance m No ❑ No ❑ No ❑ No <br /> reaches the designated regulatory level ? <br /> 7 . SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results ❑ Pass m Pass ❑ Pass ❑ Pass <br /> m Fail ❑ Fail ❑ Fail 0 Fail <br /> 8 . COMMENTS <br /> Describe all results marked "Fail' and each proposed remedy. <br /> EBW is currently set to shut off at 98 . 50 percent <br /> * Mark here if. <br /> ❑ Flow restrictors interfere with overfill prevention and equipment repairs required . <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In - Tank Setup report(s) <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.