My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1972-1986
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_1972-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2021 5:21:37 PM
Creation date
5/7/2021 8:41:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1972-1986
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Enterprises, Inc. <br /> Brown a Browra <br /> P.O.Box 8468 <br /> Stockton,Ca.95208 <br /> Stockton:(209) 952-3459 <br /> San Joaquii Cod ty Air Pollution Control District <br /> P.O. Box 00 <br /> 95201 9 <br /> Stockton, Ca f '1 Date : Auqus 17- 1 () <br /> ` <br /> $WIN LOM <br /> Subject: Proposed Asbestos Removal <br /> Sir: <br /> As per EPA regulations , we are furnishing you with the following <br /> information. <br /> Contractor : <br /> Brown & Brown Enterprises , Inc. <br /> 9618 Laramie Court <br /> Stockton, CAlifornia <br /> 95209 <br /> Mail�inq Address <br /> P.O. Box 8468 <br /> Stockton, Calif. <br /> 95208 <br /> Address of proposed work <br /> Address1800 �QukbS r- S kt n Calif <br /> building description Grant School-Teacher lounge <br /> building size 40x100 feet <br /> age of building _ 20 vears <br /> . prior use of building none_ <br /> Amount of friable asbestos material present square eet or 1 neal <br /> 350 saes feet <br /> proposed starting date Auguste 23 ,83 proposed completion Aug 24 ,83 <br /> procedures for compliance: asbestos will be removed wet, prior ,during <br /> and after strippiriq. Bagged in 6 mil. bags , placed in drum containers <br /> which Eire leak tight. , labeled. Prior- to any removal , the area will <br /> be completely sealed off. Air monitoring will be performed prior, <br /> during and after compeltion. Worker safety will be as per Title 8 <br /> -Sect,ion 5208. Compliance with USEPA regulation Title 40 part 61, sub b <br /> Waste disposal site .,sii ,7oaauin County Landfill Harney Lane <br /> Hauler-Stockton Scavenger Assocation , Inc. <br /> R ectfu11 Yo s , <br /> r;� , <br />
The URL can be used to link to this page
Your browser does not support the video tag.