My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1972-1986
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
14750
>
4400 - Solid Waste Program
>
PR0440007
>
CORRESPONDENCE_1972-1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2021 5:21:37 PM
Creation date
5/7/2021 8:41:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1972-1986
RECORD_ID
PR0440007
PE
4434
FACILITY_ID
FA0000595
FACILITY_NAME
HARNEY LANE LANDFILL
STREET_NUMBER
14750
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06503006
CURRENT_STATUS
01
SITE_LOCATION
14750 E HARNEY LN
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. H. KLEINFELDER & ASSOCIAOS <br /> File: 5-1008-.21/12 : 317 <br /> June 26, I -So00- <br /> Page 3 <br /> before drilling the east and west wells. Whichever well (or <br /> wells) on the site becomes the upgradient well must be <br /> placed far enough away from the landfill that it would not <br /> pick up any leachate from the landfill if it were to occur. <br /> Response: <br /> The wells shall be drilled in the order suggested. <br /> Comment: <br /> 3. To ensure that accurate ground water elevations are <br /> determined as ground water is encountered, proposed well <br /> locations must be surveyed before drilling begins, and a <br /> monument should be established near each well site. <br /> Elevations of completed wells must subsequently be <br /> determined to a 0.01 foot accuracy. <br /> Response: <br /> Elevations will be surveyed as suggested. <br /> Comments: <br /> 4. At each quarterly sampling, ground water levels in the wells <br /> must be determined prior to purging or sampling. In <br /> accordance with Section 2556 A. 4 Subchapter 15 , ground water <br /> contours, ground water velocity, and direction of flow must <br /> be plotted on a site map and submitted each quarter to the <br /> Regional Board. <br /> Response: <br /> Ground water levels shall be determined prior to sampling <br /> and purging of the wells as part of the quarterly monitoring <br /> program. Aquifer material will be collected during drilling <br /> so that field values for hydraulic conductivity and porosity <br /> can be determined, for use in determining ground water <br /> velocity. <br />
The URL can be used to link to this page
Your browser does not support the video tag.