Laserfiche WebLink
MCON <br /> GROUND WER SAMPLING AND ANALYSIS RECO RM <br /> PROJECT NAME : Harney Lane Landfill S--) ri ( --O co 3 <br /> SCHEDULED DATE: May 9, 1991 <br /> SPECIAL INSTRUCTIONS/CONSIDERATIONS: Project <br /> ANNUAL MONITORING EVENTAuthorization: P. Graham <br /> ,�o Project No. : 939-01.10 <br /> Call Wes Johnson 1-2 days in advance(209)468-9= ✓ Task Code: <br /> rl/z(Is arc• es{�-;pped � d�.dCa�x� p`r►1�C-aSend Results To: P. Graham <br /> Well Lodz <br /> Numbe s <br /> CHECK BOX TO AUTHORIZE DATA ENTRY Site Contact: <br /> Name Phone# <br /> Well Number Casing Casing Depth to <br /> or Source Diameter Length Water ANALYSES REQUESTED <br /> inches feet feet <br /> FOR ALL WELLS: <br /> MW-1 4.5 150.0 126.3 EPA 601 <br /> A 602 <br /> MW-2 4.5 143.0 121.8 Total Hardness <br /> S <br /> MW-3 4.5 145.0 118.8 Chlorides <br /> Chemical Oxygen Demand <br /> MW-4 4.5-...- 138.0 119.0 Nitrogen(total)—T K►rJ <br /> ate- en <br /> MBAs <br /> ........ '-` *ICP Metal Scan(see 1 ons) <br /> Fluoride <br /> r Color <br /> **Odor <br /> ..pH <br /> "EC <br /> v. <br /> 'Field Filtered <br /> "Field Measurement <br /> Laboratory and Lab OC Instructions: T <br /> ICP Metals report only: Ca,Mg, Mn,Na,As,Ba,Cd,Cr(in,Cu,Pb,Hg,So,Ag,Zn. <br /> RA PkA AA f! <br /> NOTE: IT IS VERY IMPORTANT TO I Y OF PROJECT P SAL <br /> AND WELL LOCATION MAP O THIS <br /> Page 1 <br />