Laserfiche WebLink
} <br /> EMCON ASSOCIATES-Sacramento <br /> GROUND WATER SAMPLING AND ANALYSIS REQUEST FORM (.- U Y3 <br /> PROJECT NAME : Harney Lane Landfill <br /> SCHEDULED DATE: SeptemberlL 1991 <br /> Ib <br /> SPECIAL INSTRUCTIONS/CONSIDERATIONS : Project <br /> Authorization: P. <br /> J\{ Project No. : 939-01.10 <br /> Call Wes Johnson 1-2 days in advance (209)468-3066 ,:� c,\ Task Code: <br /> Wells are equipped with dedicated pumps. '` Send Results To: P. Graham <br /> Well Lock <br /> Number(s) <br /> CHECK BOX TO AUTHORIZE DATA ENTRY Site Contact: Wes Johnson (209)468-3066 <br /> Name Phone# <br /> Well Number Casing Casing Depth to <br /> or Source Diameter Length Water ANALYSES REQUESTED <br /> inches feet feet <br /> FOR ALL WELLS: <br /> MW-1 4.5 150.0 126.1 <br /> MW-2 4.5 143.0 121.2 Total Hardness <br /> TDS <br /> MW-3 4.5 145.0 118.6 Chlorides <br /> Chemical Oxygen Demand <br /> MW-4 4.5 ` 138.0 118.6 TKN <br /> Nitrate-Nitrogen <br /> 1 "Color <br /> "Odor <br /> **pH <br /> **EC <br /> � Field Filtered <br /> "Field Measurement <br /> Laboratory and Lab QC Instructions <br /> NOTE : IT IS VERY IMPORTANT TO INCLUDE A COPY OF PROJECT PROPOSAL <br /> AND WELL LOCATION MAP OR SKETCH WITH THIS REQUEST. <br /> Page 1 <br />