Laserfiche WebLink
Mr. Gabriel KarM, P.E. Project 939-01.09 <br /> November 1, 19W <br /> Page 5 <br /> If you have any questions, please call. <br /> Very truly yours, <br /> EMCON Associates <br /> A4;1-tw�- <br /> x � <br /> Andrew P. Wang, P.E. <br /> Senior Project Engineer <br /> �Fw or <br /> Robert E. Van Heuit, P.E. <br /> Executive Manager <br /> Attachments: Table 1 - Gas probe construction details <br /> Table 2 - Gas probe monitoring results <br /> Figure 1 - Site location <br /> Figure 2 - Landfill gas monitoring plan <br /> Figure 3 - Multi-level probe installation <br /> Attachment A - Boring logs and well details <br /> Attachment B - GasTech calibration sheet <br /> PJ9 9390109.GOW <br />