Laserfiche WebLink
LOG OF-EXPLORATORY BTRING <br /> PROJECT NUMBER 939-01.09 BORING NO. GW-8 <br /> PROJECT NAME Harney Lane Landfill PAGE 3 OF 3 <br /> BY L. Gallagher DATE 10/8/91 SURFACE ELEV. ft. <br /> J . W LITHO- WELL <br /> W iL GRAPHIC DESCRIPTION DETAIL <br /> RQW Wim. Q COLUMN <br /> N <br /> S (SW), continued. <br /> BORING TERMINATED AT 44 FEET. <br /> 45 <br /> 50 <br /> 55 <br /> 60 <br /> REMARKS <br /> Boring drilled with 6-inch-diameter solid flight augers. Boring converted to a O.b-inch-ID PVC Tri-level Gas <br /> Probe. Logged from drill cuttings. <br /> ERI) <br />