Laserfiche WebLink
D�.►pre��n <br /> SYSTEM INSTALLATION <br /> L INSTALLATION GUIDELINES <br /> All Geoflow drip systems require: <br /> 100 micron/ 150 mesh filter <br /> Filter flush valve <br /> Field flush valve and <br /> Air vent in each zone <br /> All Wasteflow Classic drip systems require pressure regulation <br /> Handle your dripline and components with care. ROOTGUARD) is temperature sensitive.To assure <br /> a long life store the drip line out of direct sunlight in a cool place. This should be a consideration <br /> when installing the system in very hot and sunny areas.Your system life span will be increased if it <br /> is buried an extra two or three inches below the soil surface, to avoid the warm temperature <br /> extremes. <br /> a) All dripfield construction shall be done in accordance with Local rules and regulations. <br /> b) No utilities, cable wire, drain tile, etc shall be located in dripfield. <br /> c) Fence off entire dripfield prior to any construction. <br /> d) System is not to be installed when ground is wet or frozen. <br /> e) Divert all downspouts and surface waters away from dripfield or into curtain drains. <br /> f) Excavation, filling and grading should have been finished before installation of the subsurface <br /> drip system. <br /> g) Be sure you have everything required for the installation before opening trenches. Pre-assemble <br /> as many sets of components as practical above ground and in a comfortable place. Compression <br /> or Lockslip adapters should be glued to PVC tees, riser units should be pre-assembled, the sub- <br /> main manifold with tees can be pre-assembled and used to mark the beginning and end of <br /> WASTEFLOW lines. <br /> h) For particularly tough soil conditions moisten the soil the day before opening trenches or <br /> installing WASTEFLOW. Remember it is much easier to install the system in moist soil. The soil <br /> should be moist but still should allow the proper operation of the installation equipment and not <br /> cause smearing in the trenches.The soil surface should be dry so that the installation equipment <br /> maintains traction. <br /> i) Mark the four comers of the field.The top two corners should be at the same elevation and the <br /> bottom two comers should be at a lower elevation. In freezing conditions the bottom dripline <br /> must be higher than the supply and return line elevation at the dosing tank. <br /> j) Install a watertight dosing tank. In freezing conditions the dosing tank should be at the lowest <br /> elevation of the entire system. Install a watertight riser on the dosing tank if necessary. <br /> k) Determine the proper size for the supply and return manifolds. See Worksheet line (L). <br /> 1) Install the PVC supply line from the dosing tank, up hill through one lower and one upper corner <br /> stake of the dispersal field. Please refer to your State guidelines for depth of burial. <br /> m) Paint a line between the two remaining corner stakes. <br /> IG <br /> Geoflow Design and Installation Manuai <br />