Laserfiche WebLink
HECEIVED <br /> Monitoring System Certification JUN 1 �8 2021 <br /> UST Monitoring Site Plan ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br /> Site Address: 1427 S, Airport Way, Stockton <br /> TES . <br /> ESQ . Overpil <br /> 1 .3 . . <br /> .208 . 208 208 , <br /> Tieg'uiar ; . ' . > remiuin . . <br /> ST1' r , <br /> .420 Angular • ?,0$ 2Q8 . • 208 S. <br /> $moor FE Petro STP- <br /> • •RJ• 116 Q57.5I,bD • F v MLD • F V <br /> • � ' ATG <br /> Piping is Estimated Only. <br /> Regular & Prem. Are Split Tanks & Share Annular. • • <br /> Date map was drawn, 06/25/2019 <br /> Instructions <br /> if you already have a diagram that shows all required information, you may include it, rather than this page, with your <br /> Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify <br /> locations of the following equipment, if installed : monitoring system control panels; sensors monitoring tank annular <br /> spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak <br /> detectors ; and in-tank liquid level probes (if used for leak detection) . In the space provided, note the date this Site Plan <br /> was prepared. Page 1 of 1 05/00 <br />