Laserfiche WebLink
Table 1 <br /> Soil Boring and Well Construction Details <br /> BP Port of Stockton Terminal 0040 <br /> 2700 West Washington Street <br /> Stockton,California <br /> I= <br /> . ., <br /> 3 <br /> A' i!0600'�It SC �1en vj <br /> 0 <br /> I. Date_ <br /> MW-14B 12/07/90 41.5 4 PVC 30 34.5 40 5.5 Monitoring Well-HLA <br /> MW-14C -- -- 8 Steel -- -- 63 -- Steel Conductor Casing <br /> 12/20/90 81.0 4 PVC 65 70 80.5 10.5 Monitoring Well-HLA <br /> MW-14D -- -- 16 Steel -- -- 40 -- Steel Conductor Casing <br /> -- -- 8 Steel -- -- 84 -- Steel Conductor Casing <br /> 01/09/91 114.0 4 PVC 96 100.5 111 10.5 Monitoring Well-HLA <br /> Extraction Wells <br /> PW-1 -- -- 8 Steel -- -- 20 -- Steel Conductor Casing <br /> 12/07/90 35.5 6 Steel 20 25 35 10 Pumping Well-HLA <br /> PW-2 -- — 16 Steel -- -- 40 -- Steel Conductor Casing <br /> 12/01/90 35.5 6 Steel 58 60 75 15 Pumping Well-HLA <br /> CPT and Soil Borings <br /> HLA-7 04/19/90 23.5 -- — -- -- -- -- HLA Soil Boring <br /> CTP-1 05/19/90 60.0 HLA CPT Boring <br /> CTP-2 05/19/90 53.0 — HLA CPT Boring <br /> CTP-3 05/19/90 60.0 HLA CPT Boring <br /> CTP-4 05/19/90 54.0 — — HLA CPT Boring <br /> CTP-5 05/19/90 48.0 — HLA CPT Boring <br /> CTP-6 05/19/90 56.0 — — HLA CPT Boring <br /> MW-5A 07/08/99 1 — IT Corp-21 Hand Auger <br /> (23 borings) Borings to 1 it bgs <br /> DP-1 10/02/00 21 IT Corp Geoprobe <br /> DP-2 10/02/00 20 — — — IT Corp Geoprobe <br /> DP-3 10/03/00 21 — — _ — IT Corp Geoprobe <br /> DP-4 10/03100 20 — — — — — IT Corp Geoprobe <br /> DP-5 10/03/00 20 — — — — IT Corp Geoprobe <br /> DP-6 10/04/00 20 — — — — IT Corp Geoprobe <br /> DP-7 10/03/00 20 — — — — — IT Corp Geoprobe <br /> DP-8 10/04/00 20 -- — — — IT Corp Geoprobe <br /> DP-9 - - - - - - - - <br /> DP-10 10/04/00 21 — — — IT Corp Geoprobe <br /> DP-11 10/04/00 21 — — IT Corp Geoprobe <br /> DP-12 -- - - - - - <br /> DP-13 - -- <br /> DP-14 <br /> DP-14 10/04/00 20 — — IT Corp Geoprobe <br /> $P-ARCO/0040/Reporti7able/Well details Page 2 Of 3 <br />