Laserfiche WebLink
Table 3 <br /> Summary of Proposed Well Completions <br /> BP Port of Stockton Terminal 0040 <br /> 2700 West Washington Street <br /> Stockton,California <br /> M - = <br /> AR-MW-6A-R 1 PVC 18 8 2 3 to 18 15 3 2 to 18 16 2 to 1 1 4 <br /> PS-MW-18B 1 PVC 35 8 2 30 to 35 5 30 28 to 35 7 28 to 26 2 7 <br /> PS-MW-18C 1 Steel Conductor 50 12 8.625 -- to -- 50 -- to 0 -- to -- 0 10 <br /> PVC 70 8 2 60 to 70 10 60 58 to 70 12 58 to 56 2 4 <br /> PS-MW-21A 1 PVC 18 8 2 3 to 18 15 3 2 to 18 16 2 to 1 1 4 <br /> PS-MW-21B 1 PVC 25 8 2 10 to 25 15 10 8 to 25 17 8 to 6 2 5 <br /> PS-MW-21 C 1 Steel Conductor 50 12 8.625 -- to -- -- 50 -- to -- 0 -- to -- 0 10 <br /> PVC 70 8 2 60 to 70 10 60 58 to 70 12 58 to 56 2 4 <br /> Totals 6 16 AW-NI <br /> Explaination <br /> bgs=below ground surface <br /> Diam=Diameter of boring or well casing <br /> File:BP-ARCO\0040\Reports\Table\BP-0040-DOIlPlan-1 Page 1 of 1 <br />