My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
3000 – Underground Injection Control Program
>
PR0009077
>
SITE INFORMATION AND CORRESPONDENCE_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2021 3:15:46 PM
Creation date
5/11/2021 1:18:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3000 – Underground Injection Control Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
PRE 2019
RECORD_ID
PR0009077
PE
2960
FACILITY_ID
FA0004038
FACILITY_NAME
ARCO BULK FACILITY
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1010
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec <br /> April 30, 2010 <br /> Page 2 of 2 <br /> Reference: First Quarter 2010 Site Status, Groundwater Monitoring and Remedial Summary Report- <br /> Stockton Terminals Technical Committee Facilities <br /> Appendix K-Ozone Injection Well Monitoring Program and Revised Contingency Plan <br /> Dated April 30, concentration trends were to be evaluated for the three quarters following the <br /> initial spike period. The first evaluation period covered first quarter 2006 through third quarter <br /> 2006. Ongoing evaluation of compliance is conducted on a quarterly basis. <br /> At the request of the RWQCB, a revised contingency plan was presented in Stantec's Pilot <br /> Study Work Plan and Revised Contingency Plan, dated January 27, 2009 and is presented on <br /> the following pages. The Revised Contingency Plan was approved by the RWQCB in a letter <br /> dated March 11, 2009. <br />
The URL can be used to link to this page
Your browser does not support the video tag.