Laserfiche WebLink
Maintenance Data Ozone Sparge System-Operations and Maintenance STTC-East System <br /> Field Data Sheet 2526 West Washington Street <br /> Stockton,California <br /> Frequency Item to Inspect or Maintain Date Performed <br /> Monthly to Bi-monthly Check panel vent air filters(2). Clean or replace as necessary. <br /> Monthly to Bi-monthly Check Feed Gas Air Dryer filter bowl. A find dust may develop over time on the filter,but no <br /> moisture should be present in the bowl. If moisture is present contact us. 3 � <br /> _.................. ._ -.. <br /> Check Feed Gas Air Dryer inside the system control panel: Red light should cycle on and <br /> Monthly to Bi-monthly off every few minutes,when exhaust gas is discharged. It exhaust air discharge is on <br /> continuously,contact us. <br /> Monthly to Bi-monthly Check all lines for moisture-ensure that the air compressor system is feeding dry air to the <br /> ozone generator panel. <br /> Monthly to Bi-monthly Check HMI(touch screen)for system alarms and verify operation. <br /> Bi-weekly Check integrity of all hoses,fittings,piping,and valves <br /> ...._ ................... <br /> Bi-weekly Inspect electrical fittings and tighten as needed <br /> Bi-weekly Check controller operation <br /> .. - ._.., <br /> As-Needed Adjust controller program <br /> Bi-weekly Check flow and pressure on assemblies(system and wells) <br /> Bi-weekly Take ozone readings at compound and well boxes <br /> Br weekly Take FIB Readings <br /> Bi-weekly Check wellhead connections <br /> Bi-weekly Check/test all safety override systems <br /> Bi-weekly Measure Compressor Running Amperage <br /> Bi-weekly Check Compressor Oil <br /> As Needed Clean Com ressor Inlet Filter <br /> Calcon Systems: 925-277-0665 <br /> NOTES AND DESCRIPTION OF ACTIVITIES ON SITE <br /> Page 3 of 3 <br />